| Organization | Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity |
| Sponsor | |
| Status | Active |
| Schedule | Start Date: 6/24/2009 End Date: 6/24/2022 |
| Category | Category: |
| Type | Date | Funding Org | Funding Program | Match | Amount |
|---|
| Grant Project Agreement Totals | Proposed | Requested | Allocated | Spent | Balance |
| Type | Date | Funding Org | Funding Program | Match | Amount |
|---|
| Other Funding Totals | Requested | Allocated | Spent | Balance | |
| Grand Totals | Proposed | Requested | Allocated | Spent | Balance |
| APPLICATION | FINAL | ||||
Area Encompassed (acres) (B.0.b.1) | |||||
Miles of Stream and/or Shoreline Affected (B.0.b.2) | |||||
Miles of Stream and/or Shoreline Treated or Protected (C.0.b) | |||||
| Fish Passage Improvement | |||||
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1) | |||||
*Number of blockages / impediments / barriers impeding passage (C.2.b.4) | |||||
| Fish passage blockages removed or altered (C.2.c.1) | |||||
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2) | |||||
| Instream Habitat Project | |||||
Total Miles Of Instream Habitat Treated (C.4.b) | |||||
| Channel reconfiguration and connectivity (C.4.c.1) | |||||
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5) | |||||
Instream Pools Created/Added (C.4.c.6) | |||||
Miles of Off-Channel Stream Created or Connected (C.4.c.4) | |||||
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3) | |||||
| Channel structure placement (C.4.d.1) | |||||
Acres Of Streambed Treated for channel structure placement (C.4.d.4) | |||||
Miles of Stream Treated for channel structure placement (C.4.d.3) | |||||
Number of structures placed in channel (C.4.d.7) | |||||
Pools Created through channel structure placement (C.4.d.5) | |||||
| Riparian Habitat Project | |||||
*Total Riparian Acres Treated (C.5.b.2) | |||||
*Total Riparian Miles Streambank Treated (C.5.b.1) | |||||
| Debris/structures removal (C.5.j.1) | |||||
Acres of Riparian Area Treated. (C.5.j.2) | |||||
| Planting (C.5.c.1) | |||||
Acres Planted in riparian (C.5.c.3) | |||||
| Riparian Plant removal / control (C.5.h.1) | |||||
Acres of riparian treated for plant removal/control (C.5.h.3) | |||||
| ACQUISTION METRICS | |||||
| Real Property Acquisition | |||||
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition | |||||