Royal Arch Floodplain Restoration
#240-22-001 U #240-22-001 U
Organization Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
Sponsor
Status Active
Schedule Start Date: 6/24/2009 End Date: 6/24/2022
Category Category: 
Project Photo
DESCRIPTION
The Royal Arch Floodplain Restoration project's purpose is to improve habitat for Chinook and other salmon and trout--most centrally targeting the top priority limiting factor of lacking refuge and rearing habitat for juvenile Chinook in the mainstem Cedar River—by reconnecting a substantial area of floodplain within a 16-acre restoration project.  Improved floodplain connectivity will also modestly benefit the left-bank neighborhood from flooding impacts.
Show more  ↓
FUNDING SOURCES
Funding detail not available at this time


FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PHOTOS

 
View project on a larger map

Related Projects

  APPLICATION FINAL 
Area Encompassed (acres) (B.0.b.1)
Miles of Stream and/or Shoreline Affected (B.0.b.2)
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
Instream Pools Created/Added (C.4.c.6)
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
Miles of Stream Treated for channel structure placement (C.4.d.3)
Number of structures placed in channel (C.4.d.7)
Pools Created through channel structure placement (C.4.d.5)
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
*Total Riparian Miles Streambank Treated (C.5.b.1)
 Debris/structures removal (C.5.j.1)    
Acres of Riparian Area Treated. (C.5.j.2)
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
 
ACQUISTION METRICS
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition