NF Touchet Floodplain & Habitat Rest. RM 3.3-4.3
#18-2085 #18-2085
Organization Snake River Salmon Recovery Board Lead Entity
Sponsor Confederated Tribes of the Umatilla Indian Reservation (CTUIR)
Status Completed
Schedule Start Date: 12/5/2018 End Date: 6/21/2021
Category Category: Restoration
DESCRIPTION
The CTUIR is joining the interests of local farmers, the City of Dayton, and Columbia County to restore floodplain connectivity and fish habitat along a three-mile stretch of the North Touchet River. Project implementation will take two-three years to complete and will be done in three phases. This application addresses work that is proposed to commence in 2019 (Phase 1, Phase 2, Stage 1). Project goals include decreasing stream energy, increasing floodplain connectivity, increasing sediment deposition, increasing salmonid rearing and spawning habitat, and saving water by increasing irrigation efficiency. To achieve these goals we propose to either remove or set back nearly one mile of levee and to use large wood and boulders to act as roughness to sort sediment, provide habitat cover and scour pools. Off main channel habitat will be constructed to allow the river to spread out. We are also proposing to increase water use efficiency by replacing an older wheel irrigation system with a center pivot and replacing two inefficient pumps located at two different points of diversion with a single, efficient pump placed at one diversion point. The North Touchet is rated a priority for restoration and protection (Walla Walla Subbasin Plan 2004). The North Touchet mid-Columbia Steelhead population of natural spawners and surviving offspring is at high risk (Middle Columbia ESA Recovery Plan 2009), and the river is a major spawning area for steelhead and spring/summer Chinook.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/03/2018Confederated Tribes of the Umatilla Indian Reservation (CTUIR)Match$305,294.00
Requested08/03/2018Recreation and Conservation Office (RCO)Salmon State Projects$512,106.00
Allocated06/03/2021Confederated Tribes of the Umatilla Indian Reservation (CTUIR)Match$281,216.93
Allocated06/03/2021Recreation and Conservation Office (RCO)Salmon Federal Projects$471,718.65
Spent06/03/2021Confederated Tribes of the Umatilla Indian Reservation (CTUIR)Match-$281,216.93
Spent06/03/2021Recreation and Conservation Office (RCO)Salmon Federal Projects-$471,718.65
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,624,126.00 $817,400.00 $752,935.58 $752,935.58 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Middle Columbia River Spring, Not Warranted
County:Columbia
HUC12:Lower North Fork Touchet River (170701020308)
HUC12:Middle North Fork Touchet River (170701020302)
HUC8:Walla Walla (17070102)
Lead Entity Area:Snake River
Legislative District:09
Salmon Recovery Regions:Snake River
Sections:11
Snake Major Spawning Areas:Upper Touchet
Steelhead-Pop (ESU):Steelhead-Middle Columbia River, Touchet River, Threatened
Township:T09NR39E
Watershed Administrative Unit:NF Touchet
Watershed Administrative Unit:Walla Walla Agricultural Lands
WRIA:Walla Walla
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
1.00mi1.00mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.00mi1.00mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
10.00acres10.00acres
Instream Pools Created/Added (C.4.c.6)
15.0015.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.20mi0.20mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.79mi0.79mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
1.00mi1.00mi
Number of structures placed in channel (C.4.d.7)
30.0054.00
Pools Created through channel structure placement (C.4.d.5)
20.0020.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
10.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
1.00mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
10.00acres
Miles of streambank planted (C.5.c.4)
1.00mi