North Touchet Phase 3
#20-1050 #20-1050
Organization Snake River Salmon Recovery Board Lead Entity
Sponsor Confederated Tribes of the Umatilla Indian Reservation (CTUIR)
Status Completed
Schedule Start Date: 9/16/2020 End Date: 5/20/2022
Category Category: Restoration
DESCRIPTION
The CTUIR proposes to increase channel complexity and floodplain connectivity while improving fish habitat on the North Touchet River as part of an ongoing phased project? The overall project occurs in three phases (2019, 2020, and 2021) over three miles (RM 1.3-4.3). This grant application seeks funding to implement the third phase (RM 2.0-2.7) in 2021. The work included in the third phase, to which this application is addressed, will occur on both the right and left banks with the majority of the work scheduled to occur on the left bank. Three private landowners will participate in this phase. The primary element in this phase includes the setting back of 3,600 feet of a levee. The levee setback on the left bank will require the current landowner, Empey Holdings, LLC., to give up at least 8 acres of land that is currently in apple production. The total area that would then be incorporated in the active floodplain on the left bank is 18 acres. Tearing down the existing levee and building the setback levee will require moving some 35,000 cubic yards of material. Habitat structures, largely in the form of large wood, will be installed along the entire project reach. We also intend to replace an 80 foot channel constricting rail car bridge with a 150 foot span bridge to allow the channel room to migrate laterally. Along the right bank, there are two riparian forested areas that will have alcoves constructed in them to act as refugia for juvenile salmonids.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/16/2020Confederated Tribes of the Umatilla Indian Reservation (CTUIR)Match$304,833.00
Requested04/16/2020Recreation and Conservation Office (RCO)Salmon State Projects$395,417.00
Allocated04/20/2022Confederated Tribes of the Umatilla Indian Reservation (CTUIR)Match$304,832.66
Allocated04/20/2022Recreation and Conservation Office (RCO)Salmon State Projects$496,416.45
Spent04/20/2022Confederated Tribes of the Umatilla Indian Reservation (CTUIR)Match-$304,832.66
Spent04/20/2022Recreation and Conservation Office (RCO)Salmon State Projects-$496,416.45
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$2,100,000.00 $700,250.00 $801,249.11 $801,249.11 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Middle Columbia River Spring, Not Warranted
County:Columbia
HUC12:Lower North Fork Touchet River (170701020308)
HUC8:Walla Walla (17070102)
Lead Entity Area:Snake River
Legislative District:09
Salmon Recovery Regions:Snake River
Sections:03
Snake Major Spawning Areas:Upper Touchet
Steelhead-Pop (ESU):Steelhead-Middle Columbia River, Touchet River, Threatened
Township:T09NR39E
Watershed Administrative Unit:Walla Walla Agricultural Lands
WRIA:Walla Walla
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
1.09mi1.13mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.09mi1.13mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
15.70acres17.90acres
Instream Pools Created/Added (C.4.c.6)
0.000.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.10mi0.10mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.99mi1.13mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
1.09mi1.13mi
Number of structures placed in channel (C.4.d.7)
28.008.00
Pools Created through channel structure placement (C.4.d.5)
10.008.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
10.20acres15.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.89mi1.13mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
10.20acres15.00acres
Miles of streambank planted (C.5.c.4)
0.89mi