DESCRIPTION
BPA Contract 56662 REL 8. This work is part of a large multi-project, multi-sponsor effort under the Entiat Intensively Monitored Watershed (IMW) that will lead to construction in 2014. This contract is providing funds only for the design of habitat enhancement projects in the Lower Entiat RM 2.6-3.5 to increase habitat diversity and complexity for juvenile and adult Upper Columbia River Spring Chinook and steelhead. The proposed project would consist of approximately 15 Large Woody Material (LWM) structures along the peripheral and marginal areas and approximately 25 boulder cluster configurations in the mainstem over the course of approximately 1.0 mile and five landowners.
All YN staff time and expenses associated with this work are being provided through YN Accord Project 2009-003-00, agreement 56662-02.
BPA Contract 56662 REL 8. This work is part of a large multi-project, multi-sponsor effort under the Entiat Intensively Monitored Watershed (IMW) that will lead to construction in 2014. This contract is providing funds only for the design of habitat enhancement projects in the Lower Entiat RM 2.6-3.5 to increase habitat diversity and complexity for juvenile and adult Upper Columbia River Spring Chinook and steelhead. The proposed project would consist of approximately 15 Large Woody Material (LWM) structures along the peripheral and marginal areas and approximately 25 boulder cluster configurations in the mainstem over the course of approximately 1.0 mile and five landowners.
All YN staff time and expenses associated with this work are being provided through YN Accord Project 2009-003-00, agreement 56662-02. CBFish Contract link: https://www.cbfish.org/Contract.mvc/Summary/56662%20REL%208