Lower Ohop Creek Restoration, Phase 1
#11-OHOP-1001 #11-OHOP-1001
Organization Nisqually River Salmon Recovery Lead Entity
Sponsor South Puget Sound Salmon Enhancement Group (SPSSEG)
Status Completed
Schedule Start Date: 6/1/2006 End Date: 3/5/2010
Category Category: Restoration
Project Photo
DESCRIPTION
Ohop Creek is a Nisqually River tributary located in Pierce County Washington, near Eatonville. It supports stocks of Fall Chinook, coho and pink salmon, steelhead, and resident trout species. Evaluation of multi-species salmon habitat needs in the Nisqually watershed have ranked lower Ohop Creek one of the highest priority freshwater habitats for restoration. Funded by a previous SRFB grant, a restoration plan for lower Ohop Creek was developed which summarizes habitat conditions in the project reach and evaluates restoration alternatives. Using that assessment, the most comprehensive restoration alternative has been selected and engineering designs developed. The landowners in the project reach are all supportive of this option. The project area included lands purchased by the Nisqually Land Trust using SRFB grants from previous rounds to ensure their availability for this proposed project. Phase I of this project re-elevated 4.4 miles of severely channelized creek back into its original floodplain recreating a 5.3 mile long stream with its original meander pattern and restoring its hydrologic connection to the adjacent floodplain and wetland areas. Off-channel habitat was created and the riparian areas were planted with native vegetation. This grant will support implementation of about a mile of reconstructed stream in Phase I. Phase I will be implemented in 2007.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/30/2005South Puget Sound Salmon Enhancement Group (SPSSEG)Match$195,264.00
Requested09/30/2005Recreation and Conservation Office (RCO)Salmon State Projects$1,106,490.00
Allocated03/05/2010South Puget Sound Salmon Enhancement Group (SPSSEG)Match$180,973.24
Allocated03/05/2010Recreation and Conservation Office (RCO)Salmon Federal Projects$1,025,287.92
Spent02/16/2010South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$180,973.24
Spent02/16/2010Recreation and Conservation Office (RCO)Salmon Federal Projects-$1,025,287.92
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,206,261.16 $1,301,754.00 $1,206,261.16 $1,206,261.16 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Nisqually River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Pierce
HUC12:Ohop Creek (171100150203)
HUC8:Nisqually (17110015)
Lead Entity Area:Nisqually River
Legislative District:02
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:18
Sections:25
Steelhead-Pop (ESU):Steelhead-Puget Sound, Nisqually River, Threatened
Township:T16NR03E
Township:T16NR04E
Watershed Administrative Unit:Ohop Creek
WRIA:Nisqually
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
1.00mi4.40mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.00mi4.40mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
2.00acres
Instream Pools Created/Added (C.4.c.6)
5.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
8.20mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
4.40mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
3.50acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
4.40mi
Number of structures placed in channel (C.4.d.7)
8.00
Pools Created through channel structure placement (C.4.d.5)
5.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
 Spawning gravel placement (C.4.f.1)    
Cubic Yards of spawning gravel placed (C.4.f.3)
35.00cubic yds
Miles of Stream Treated with spawning gravel placement (C.4.f.2)
2.00mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi4.40mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
12.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
4.40mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
7.00acres
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
7.00acres
ADDITIONAL INFORMATION