Dyes Inlet Bulkhead Removal Demonstration (Blyth/Beauchamp)
#CK Blyth/Beauchamp #CK Blyth/Beauchamp
 Central Kitsap Projects Dyes Inlet Dyes Inlet Bulkhead Removal Demonstration (Blyth/Beauchamp)
Organization West Sound Partners for Ecosystem Recovery
Sponsor Kitsap County
Status Completed
Schedule Start Date: 1/1/2013 End Date: 9/30/2015
Priority 1
Category Category: Restoration
Project Photo
DESCRIPTION
This project involves two properties on the east shore of Dyes inlet, south of the Anna Smith bulkhead removal project. Also a final demonstration component of the EPA-Funded Kitsap Regional Shoreline Restoration Project, it would remove approximately 130' of rockwall bulkhead. The first phase includes a geotechnical feasibility report, followed by design and engineering. This project may or may not be funded through to construction under the EPA grant due to timeline constraints. Identified through a landowner interest survey sent out to property owners within priority sediment source reaches (Kitsap Sediment Source Analysis), the landowners are willing to move foreward with feasibility.
Show more  ↓
GOAL
Geotechnical Feasibility Report
Goal: 0   Actual: 1  Notes: Feasibility report concluded that the slope conditions pose some uncertainty and a higher degree of risk with respect to bulkhead removal. It recommended a more conservative approach with commences with a shoreline buffer planting to increase slope stability and enhance habitat.
GOAL
Native planting plan design and installation for shoreline buffer.
Goal: 0   Actual: 1  Notes: Plants were planted along shoreline.
GOAL
Remove 100 cubic yards of angular rock debris and old wood pilings from beach substrates. Measure: bulkhead removal
Goal: 650 Feet  Actual: 650 Feet Notes: Debris removed from beach.
FUNDING
Proposed Cost $50,000
Requested Funds $0
Allocated Funds $50,000
Spent Funds $48,067.99
Balance $1,932.01
FUNDING SOURCE
US Environmental Protection Agency$50,000
FUNDING SOURCES
PROJECT CONTACT
SPONSOR
PHOTOS

 
LOCATION
Legislative District:23
Sections:28
HUC12:Barker Creek-Frontal Dyes Inlet (171100190706)
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
WRIA:Kitsap
County:Kitsap
Puget Sound Action Areas:North Central Puget Sound
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Salmon Recovery Regions:Puget Sound
HUC8:Puget Sound (17110019)
Steelhead-Pop (ESU):Steelhead-Puget Sound, East Kitsap Peninsula Tributaries, Threatened
Township:T25NR01E
Lead Entity Area:West Sound
View project on a larger map

Related Projects

BULKHEAD REMOVAL
bulkhead removal 650 Feet