DESCRIPTION
This area includes Port Orchard Bay south of Brownsville, Dyes Inlet, Sinclair Inlet to Port Orchard.
Show more  ↓
FUNDING
Proposed Cost $45,633,116.04
Requested Funds $0
Allocated Funds $0
Spent Funds $0
Balance $0
FUNDING SOURCES
PROJECT CONTACT
GRANT MANAGER
LEAD ENTITY COORDINATOR
PHOTOS

 
View project on a larger map

Related Projects

ACTIVITY-ESTUARINE / NEARSHORE PROJECT PCSRF
* Total Amount of Estuarine / Nearshore Acres Treated
95%
1.71 Actual
1.8 Planned
Acres
Acres of Estuary Created
95%
1.71 Actual
1.8 Planned
Acres
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal 24.8 Acres 12/31/2013
Miles of Shoreline Treated for armor modification/removal 00.32 Miles 8/31/2012 - 7/31/2014
ACTIVITY-FISH PASSAGE IMPROVEMENT PCSRF
* Miles of Stream Made Accessible
81%
22.71 Actual
28.21 Planned
Miles
*Number of Blockages/Impediments/Barriers Impeding Passage
225%
9 Actual
4 Planned
Number
Number of bridges
300%
9 Actual
3 Planned
Number
ACTIVITY-INSTREAM HABITAT PROJECT PCSRF
Miles of Streambank Stabilized
157%
0.47 Actual
0.3 Planned
Miles
Total Miles Of Instream Habitat Treated
126%
1.01 Actual
0.8 Planned
Miles
Acres Of Off-Channel/Floodplain Connected Or Added 00.6 Acres
Cubic Yards of spawning gravel placed 1,479 Cu Yards 10/31/2012
Miles of Off-Channel Stream Created 00.18 Miles
Miles of Stream Treated with spawning gravel placement 00.28 Miles
Number of structures placed in channel 192 Number 9/30/2012 - 9/30/2013
ACTIVITY-REAL PROPERTY ACQUISITION PCSRF
Acres Of Land, Wetland Or Estuarine Area Conserved By Acquisition Or Lease 34.5 Acres
Miles Of Streambank Protected By Land or Easement Acquisition 00.42 Miles
ACTIVITY-RIPARIAN HABITAT PROJECT PCSRF
* Total Riparian Acres Treated 05.87 Acres 10/15/2012 - 11/29/2013
* Total Riparian Miles Streambank Treated 00.63 Miles 10/15/2012 - 11/29/2013
Acres of riparian treated for plant removal/control 02.91 Acres 10/1/2012 - 10/15/2012
Acres Planted in riparian 08.61 Acres 10/15/2012 - 10/30/2012
Miles of streambank treated for plant removal/control 00.2 Miles
ASSESSMENTS
assessment report completion 03 Each
BULKHEAD REMOVAL
bulkhead removal 1,050 Feet
DESIGN PLANS FOR CONSTRUCTION
design or plan was completed as funded 06 Each
OUTREACH AND EDUCATION
demonstration project
demonstration project
WEST SOUND WATERSHED EXAMPLE CODES
Backyard Habitat Project
Sequenced step in a restoration plan
This project is part of the three year list