Chico Crk Inst. Restoration Phase 2 Construction
#09-1672 #09-1672
 Central Kitsap Projects Dyes Inlet Chico Crk Inst. Restoration Phase 2 Construction
Organization West Sound Partners for Ecosystem Recovery
Sponsor Kitsap County Community Development
Status Completed
Schedule Start Date: 12/10/2009 End Date: 1/29/2013
Priority 1
Category Category: Restoration
Project Photo
DESCRIPTION
Kitsap County Dept. of Community Development partnered with Kitsap Golf and Country Club (property owner) on the restoration project located in the lower mile of Chico Creek, which flows to Dyes Inlet in Kitsap County. The restoration project: · Extended the stream length from approximately 560 linear feet to 600 feet, · Constructed two new side channels adding approx. 400 feet of side channel adjacent to the main channel. · Reconnected the creek to its floodplain by extending the stream banks to slope 35-40 feet beyond the original top of bank. · Removed 200 feet of armoring on right and left banks. · Replaced the old log weirs. · Provided Channel meanders to lengthen the stream. · Replaced an undersized pedestrian stream crossing that was a barrier to fish passage, with a 97 ft. long clear span roscoe pedestrian bridge · Installed 3000 native plants that are being maintained by golf course staff. · Installed over 120 large wood pieces ranging in size from 10-80 feet, 10-36 inches in diameter with over 20 pieces of root wads. Chico Creek is a high priority stream for salmonid protection and restoration and this location was prioritized in the Chico Creek Mainstem Restoration Plan (2004). The project reach had been channelized and disconnected from its historic floodplain with a significantly impaired riparian buffer. There was originally one project (#04-1209) funded to restore the entire stretch of Chico Creek through the Kitsap Golf and Country Club. As the design for that project progressed, new cost estimates were too high for the original SRFB grant so the project construction was broken into 2 phases. This portion of the restoration is phase 2, and the primary construction was completed in 2010. Some additional construction occurred in 2011: some adjustment of structure placement after flooding in winter 2010, and final repairs to the golf course itself associated with the restoration project (tree removal and storage areas, golf cart paths). The other projects funded by the SRFB that are associated with this restoration are #08-1639, and 10-1879.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/25/2009Kitsap County Comm DevelopmentMatch$124,800.00
Requested08/25/2009Salmon Recovery Funding BoardSalmon State Projects$707,200.00
Allocated01/28/2013Salmon Recovery Funding BoardSalmon State Projects$44,655.00
Allocated01/28/2013Kitsap County Comm DevelopmentMatch$126,550.00
Allocated01/28/2013Salmon Recovery Funding BoardPuget Sound Acq. & Restoration$668,123.67
Spent12/09/2010Salmon Recovery Funding BoardSalmon State Projects-$44,655.00
Spent01/28/2013Kitsap County Comm DevelopmentMatch-$126,550.00
Spent01/28/2013Salmon Recovery Funding BoardPuget Sound Acq. & Restoration-$668,123.67
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$839,328.67 $832,000.00 $839,328.67 $839,328.67 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PROJECT CONTACT
GRANT MANAGER
LAND OWNER
PROJECT MANAGER
SPONSOR
PHOTOS

 
LOCATION
Sections:05
Legislative District:35
HUC12:Chico Creek-Frontal Sinclair Inlet (171100190705)
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
City Areas:Erlands Point-Kitsap Lake
WRIA:Kitsap
County:Kitsap
Puget Sound Action Areas:North Central Puget Sound
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Salmon Recovery Regions:Puget Sound
HUC8:Puget Sound (17110019)
Steelhead-Pop (ESU):Steelhead-Puget Sound, East Kitsap Peninsula Tributaries, Threatened
Township:T24NR01E
Lead Entity Area:West Sound
View project on a larger map

Related Projects

ACTIVITY-FISH PASSAGE IMPROVEMENT PCSRF
* Miles of Stream Made Accessible 16 Miles
*Number of Blockages/Impediments/Barriers Impeding Passage 01 Number
ACTIVITY-INSTREAM HABITAT PROJECT PCSRF
Miles of Streambank Stabilized
222%
0.2 Actual
0.09 Planned
Miles
Total Miles Of Instream Habitat Treated
100%
0.31 Actual
0.31 Planned
Miles
Acres Of Off-Channel/Floodplain Connected Or Added 00.4 Acres
Cubic Yards of spawning gravel placedNot entered
Miles of Off-Channel Stream Created 00.07 Miles
Miles of Stream Treated with spawning gravel placementNot entered
Number of structures placed in channel 12 Number
ACTIVITY-RIPARIAN HABITAT PROJECT PCSRF
* Total Riparian Acres Treated
559%
1.9 Actual
0.34 Planned
Acres
* Total Riparian Miles Streambank Treated
45%
0.2 Actual
0.44 Planned
Miles
Acres Planted in riparian 01.9 Acres
ADDITIONAL INFORMATION