Chico Crk Inst. Restoration Phase 2 Construction
#09-1672 #09-1672
 Central Kitsap Projects Dyes Inlet Chico Crk Inst. Restoration Phase 2 Construction
Organization West Sound Partners for Ecosystem Recovery
Sponsor Kitsap County Community Development
Status Completed
Schedule Start Date: 12/10/2009 End Date: 1/29/2013
Category Category: Restoration
Project Photo
DESCRIPTION
Kitsap County Dept. of Community Development partnered with Kitsap Golf and Country Club (property owner) on the restoration project located in the lower mile of Chico Creek, which flows to Dyes Inlet in Kitsap County. The restoration project: · Extended the stream length from approximately 560 linear feet to 600 feet, · Constructed two new side channels adding approx. 400 feet of side channel adjacent to the main channel. · Reconnected the creek to its floodplain by extending the stream banks to slope 35-40 feet beyond the original top of bank. · Removed 200 feet of armoring on right and left banks. · Replaced the old log weirs. · Provided Channel meanders to lengthen the stream. · Replaced an undersized pedestrian stream crossing that was a barrier to fish passage, with a 97 ft. long clear span roscoe pedestrian bridge · Installed 3000 native plants that are being maintained by golf course staff. · Installed over 120 large wood pieces ranging in size from 10-80 feet, 10-36 inches in diameter with over 20 pieces of root wads. Chico Creek is a high priority stream for salmonid protection and restoration and this location was prioritized in the Chico Creek Mainstem Restoration Plan (2004). The project reach had been channelized and disconnected from its historic floodplain with a significantly impaired riparian buffer. There was originally one project (#04-1209) funded to restore the entire stretch of Chico Creek through the Kitsap Golf and Country Club. As the design for that project progressed, new cost estimates were too high for the original SRFB grant so the project construction was broken into 2 phases. This portion of the restoration is phase 2, and the primary construction was completed in 2010. Some additional construction occurred in 2011: some adjustment of structure placement after flooding in winter 2010, and final repairs to the golf course itself associated with the restoration project (tree removal and storage areas, golf cart paths). The other projects funded by the SRFB that are associated with this restoration are #08-1639, and 10-1879.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/25/2009Kitsap County Community DevelopmentMatch$124,800.00
Requested08/25/2009Recreation and Conservation Office (RCO)Salmon State Projects$707,200.00
Allocated01/28/2013Recreation and Conservation Office (RCO)Salmon State Projects$44,655.00
Allocated01/28/2013Kitsap County Community DevelopmentMatch$126,550.00
Allocated01/28/2013Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$668,123.67
Spent12/09/2010Recreation and Conservation Office (RCO)Salmon State Projects-$44,655.00
Spent01/28/2013Kitsap County Community DevelopmentMatch-$126,550.00
Spent01/28/2013Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$668,123.67
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$839,328.67 $832,000.00 $839,328.67 $839,328.67 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Erlands Point-Kitsap Lake
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Kitsap
HUC12:Chico Creek-Frontal Sinclair Inlet (171100190705)
HUC8:Puget Sound (17110019)
Lead Entity Area:West Sound
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:North Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:05
Steelhead-Pop (ESU):Steelhead-Puget Sound, East Kitsap Peninsula Tributaries, Threatened
Township:T24NR01E
Watershed Administrative Unit:Chico Creek
WRIA:Kitsap
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.22mi0.31mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
16.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
16.00sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
0.00cfs
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.31mi0.31mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.40acres
Instream Pools Created/Added (C.4.c.6)
20.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.07mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.31mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
4.60acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.31mi
Number of structures placed in channel (C.4.d.7)
12.00
Pools Created through channel structure placement (C.4.d.5)
20.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
40.00yd
 Spawning gravel placement (C.4.f.1)    
Cubic Yards of spawning gravel placed (C.4.f.3)
0.00cubic yds
Miles of Stream Treated with spawning gravel placement (C.4.f.2)
0.00mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.09mi0.20mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.34acres1.90acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.44mi0.20mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
1.90acres
ADDITIONAL INFORMATION