JimmyComeLately Restoration
#180-22-001 U #180-22-001 U
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor
Status Planned
Schedule Start Date: 1/1/1999 End Date: 12/31/2009
Category Category: 
Project Photo
DESCRIPTION
Acquisition and restoration on JimmyComeLately Creek and Estuary
Show more  ↓
FUNDING SOURCES
Funding detail not available at this time


FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PHOTOS

 
View project on a larger map

Related Projects

  APPLICATION FINAL 
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
 Dike Or berm modification / removal (C.9.d.1)    
Miles Of Dikes Modified/Removed (C.9.d.2)
 Removal of existing fill material (C.9.g.1)    
Acres of Estuary Treated through fill material removal (C.9.g.2)
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
Number of bridges (C.2.g.2)
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
Floodplain Project    
 Floodplain Improvement    
Miles of site maintenance with the floodplain
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
 Channel structure placement (C.4.d.1)    
Number of structures placed in channel (C.4.d.7)
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
*Total Riparian Miles Streambank Treated (C.5.b.1)
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
Site Stewardship Project    
 Restored land maintained (C.11.c.1)    
Acres of restored land maintained (C.11.c.2)
 
ACQUISTION METRICS
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition