| Organization | North Olympic Peninsula Lead Entity for Salmon |
| Sponsor | |
| Status | Planned |
| Schedule | Start Date: 1/1/1999 End Date: 12/31/2009 |
| Category | Category: |
| Type | Date | Funding Org | Funding Program | Match | Amount |
|---|
| Grant Project Agreement Totals | Proposed | Requested | Allocated | Spent | Balance |
| Type | Date | Funding Org | Funding Program | Match | Amount |
|---|
| Other Funding Totals | Requested | Allocated | Spent | Balance | |
| Grand Totals | Proposed | Requested | Allocated | Spent | Balance |
| APPLICATION | FINAL | ||||
Miles of Stream and/or Shoreline Treated or Protected (C.0.b) | |||||
| Estuarine / Nearshore Project | |||||
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b) | |||||
| Dike Or berm modification / removal (C.9.d.1) | |||||
Miles Of Dikes Modified/Removed (C.9.d.2) | |||||
| Removal of existing fill material (C.9.g.1) | |||||
Acres of Estuary Treated through fill material removal (C.9.g.2) | |||||
| Fish Passage Improvement | |||||
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1) | |||||
*Number of blockages / impediments / barriers impeding passage (C.2.b.4) | 1.00 | ||||
| Bridge installed or improved (C.2.g.1) | |||||
Miles of stream made accessible by bridge installation/repair (C.2.g.3) | |||||
Number of bridges (C.2.g.2) | |||||
| Culvert installed or improved (C.2.f.1) | |||||
Miles of stream made accessible by culvert installation/repair (C.2.f.3) | |||||
| Fish passage blockages removed or altered (C.2.c.1) | |||||
Change in water flow (fish passage project)(cu feet) | |||||
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2) | |||||
| Road-crossing removal (C.2.i.1) | |||||
Miles of stream made accessible by road crossing removal (C.2.i.3) | |||||
| Floodplain Project | |||||
| Floodplain Improvement | |||||
Miles of site maintenance with the floodplain
| |||||
| Instream Habitat Project | |||||
Total Miles Of Instream Habitat Treated (C.4.b) | |||||
| Channel reconfiguration and connectivity (C.4.c.1) | |||||
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5) | |||||
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3) | |||||
| Channel structure placement (C.4.d.1) | |||||
Number of structures placed in channel (C.4.d.7) | |||||
| Riparian Habitat Project | |||||
*Total Riparian Acres Treated (C.5.b.2) | |||||
*Total Riparian Miles Streambank Treated (C.5.b.1) | |||||
| Planting (C.5.c.1) | |||||
Acres Planted in riparian (C.5.c.3) | |||||
| Site Stewardship Project | |||||
| Restored land maintained (C.11.c.1) | |||||
Acres of restored land maintained (C.11.c.2) | |||||
| ACQUISTION METRICS | |||||
| Real Property Acquisition | |||||
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition | |||||