Pysht Floodplain Acquisition and Restoration
#09086.1 #09086.1
 WRIA19 Pysht River Pysht Floodplain Acquisition and Restoration
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor Lower Elwha Klallam Tribe
Status Planned
Schedule
Category Category: Acquisition & Restoration
Project Photo
DESCRIPTION

This is a multi-phase project. North Olympic Land Trust completed Phase I (RCO grant # 09-1528), Phase II (RCO grant # 10-1509), and Phase III (RCO grant # 13-1062) of the project, using SRFB grant funds to conserve 136 acres of Pysht River floodplain. Thirty-seven Engineered Log Jams have been installed between River Mile 8.0-9.5, and fifteen additional log jams will be installed in 2018 (RCO Grant #15-1061).The Pysht is also a priority in the Western Straits Conservation Plan (RCO grant #09-1518).

Phase IV and other future phases will protect additional floodplain and riparian habitat along the Pysht River, by means of conservation easements and fee simple acquisition, particularly those properties identified as priorities in the Western Straits Conservation Plan (RCO grant #09-1519). NOLT is working with landowners between RM 6.6 to approximately RM 9.9. The project will be complete when a river corridor from the estuary to River Mile 9.9 is conserved.

*2025 update:

This is a restoration design project that will advance restoration on the Pysht River between river mile 2.5-7.3. We propose to conduct a geomorphic, hydrologic and hydraulic analysis of this reach that will support the development of engineered restoration plans and associated cost estimates. This design will inform future restoration implementation in this reach of the river. The project builds upon past conservation acquisitions as well as extends restoration efforts in the mainstem Pysht River. North Olympic Land Trust completed Phase I (RCO grant # 09-1528), Phase II (RCO grant # 10-1509), and Phase III (RCO grant # 13-1062) of the project, using SRFB grant funds to conserve 136 acres of Pysht River floodplain. Thirty-seven Engineered Log Jams have been installed between River Mile 8.0-9.5 (RCO Grant #15-1061) building upon a previous PCSRF funded project completed in 2021 between river mile 11.0-12.5. The Pysht is also a priority in the Western Straits Conservation Plan (RCO grant #09-1518).

Show more  ↓
FUNDING SOURCES
Funding detail not available at this time


FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
POTENTIAL SPONSOR
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Clallam
HUC12:Pysht River (171100210701)
HUC8:Crescent-Hoko (17110021)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Puget Sound
Sections:18
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T31NR11W
Watershed Administrative Unit: Pysht River
WRIA:Lyre - Hoko
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
ADDITIONAL INFORMATION