Pysht River Floodplain Acquisition (Phase I)
#09-1528 #09-1528
 WRIA19 Pysht River Pysht River Floodplain Acquisition (Phase I)
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor North Olympic Land Trust
Status Completed
Schedule Start Date: 12/10/2009 End Date: 6/13/2012
Category Category: Acquisition & Restoration
Project Photo
DESCRIPTION
This project permanently protected 21.59 acres of Pysht river floodplain and channel migration zone (CMZ). This area is situated between river mile 8.0 and 9.0, containing approximately 0.3 miles of the Pysht river in western Clallam County. The property encompasses both sides of the river and occupies a critical transition zone of the valley. Over half of the property is large river or large river floodplain within 200 feet. Acquisition of this parcel has ensured the protection of the mature conifer stand along the NW parcel boundary that provides substantial canopy cover to a "high use" spawning reach for numerous salmon species. Since acquiring the parcel on August 20, 2010, we have revegetated riparian areas that had been converted to pasture land, worked to eradicate exotic species (blackberry) that had spread throughout the property, demolished existing infrastructure that had been contributing to decreased floodplain connectivity, removed associated debris, removed a bus, and constructed a parking lot with fencing. Future phases have already been completed. 1. The Land Trust acquired the VanCalcar property, one parcel removed from Hart, April 26, 2011, with funding from grant #10-1509. 2. The Burdick easement, also part of grant #10-1509, is on track to close by the end of 2012. 3. On this site, future project phases will include instream habitat restoration. Funding for design only phase of ELJs in the Pysht will be available by the end of 2011, and meetings between the Makah Tribe, Lower Elwha Klallam Tribe and the Land Trust will begin January or February of 2012.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/21/2009North Olympic Land TrustMatch$37,228.00
Requested08/21/2009Recreation and Conservation Office (RCO)Salmon State Projects$189,057.00
Allocated05/23/2012North Olympic Land TrustMatch$34,816.97
Allocated05/23/2012Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$176,812.93
Spent05/18/2011Recreation and Conservation Office (RCO)Salmon Federal Projects-$0.00
Spent05/18/2012North Olympic Land TrustMatch-$34,816.97
Spent05/18/2012Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$176,812.93
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$226,285.00 $226,285.00 $211,629.90 $211,629.90 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Clallam
HUC12:Pysht River (171100210701)
HUC8:Crescent-Hoko (17110021)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Puget Sound
Sections:13
Sections:14
Sections:23
Sections:24
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T31NR12W
Watershed Administrative Unit: Pysht River
WRIA:Lyre - Hoko
View project on a larger map

Related Projects

  APPLICATION FINAL 
ACQUISTION METRICS
Incidentals    
 Noxious weed control    
Acres treated for noxious weeds by method
Total
acres
Mechanical
Total
acres
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition
0.43mi0.43mi
 Land    
Acres by Acreage Type (fee simple)
Riparian
21.59
Total
21.59
acres
Riparian
13.64
Uplands
4.50
Wetlands
3.45
Total
21.59
acres
 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.21mi0.43mi
Upland Habitat And Sediment Project    
Acres of Upland Habitat Area Treated (C.6.b.1)
9.50acres
Miles of Road Treated (C.6.b.2)
0.00mi
 Upland vegetation management (C.6.h.1)    
Acres Treated for upland vegetation management (C.6.h.3)
9.50acres
Wetland Project    
Total Acres Of Wetland Area Treated (C.8.b)
3.50acres
 Wetland planting (C.8.c.1)    
Acres of wetland planted (C.8.c.3)
3.50acres