Bridge to Bridge Restoration Phase 2-
#17-1267 #17-1267
Organization Snake River Salmon Recovery Board Lead Entity
Sponsor Tri-State Steelheaders Inc
Status Completed
Schedule Start Date: 1/19/2018 End Date: 1/14/2022
Category Category: Restoration
DESCRIPTION
The Bridge to Bridge Restoration Design completed in 2010 provided 30% plans for nearly two miles of the Walla Walla River. Final designs were completed for the upper third of the design reach, and implementation of those plans was completed in 2013. Final designs are now complete for the remaining part of the design reach. This project will address limiting factors by placing logs and log structures to improve channel complexity, maintain pools, create off-channel areas, and establish riparian vegetation on eroding banks. Riparian plantings will also address limiting factors by increasing shading, and improving riparian function. This section of the Walla Walla River is identified by The Snake River Salmon Recovery Plan as a priority restoration reach in the Walla Walla mainstem MSA. Adult and juvenile summer steelhead and spring chinook use the project reach during their migrations and bull trout occur there seasonally. Other species of cultural value and state concern that utilize the project reach are margined sculpin, leopard dace, and river lamprey.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/10/2017Tri-State Steelheaders IncMatch$80,000.00
Requested08/10/2017Recreation and Conservation Office (RCO)Salmon State Projects$430,461.00
Allocated01/06/2022Tri-State Steelheaders IncMatch$53,400.13
Allocated01/06/2022Recreation and Conservation Office (RCO)Salmon State Projects$302,597.46
Spent01/06/2022Tri-State Steelheaders IncMatch-$53,400.13
Spent01/06/2022Recreation and Conservation Office (RCO)Salmon State Projects-$302,597.46
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$635,807.00 $510,461.00 $355,997.59 $355,997.59 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Middle Columbia River Spring, Not Warranted
County:Walla Walla
HUC12:Mud Creek-Walla Walla River (170701021102)
HUC8:Walla Walla (17070102)
Lead Entity Area:Snake River
Legislative District:16
Salmon Recovery Regions:Snake River
Sections:38
Snake Major Spawning Areas:Middle Walla Walla River
Steelhead-Pop (ESU):Steelhead-Middle Columbia River, Walla Walla River, Threatened
Township:T07NR34E
Watershed Administrative Unit:Walla Walla Agricultural Lands
WRIA:Walla Walla
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.61mi0.66mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.61mi0.66mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.10acres0.20acres
Instream Pools Created/Added (C.4.c.6)
15.0011.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.10mi0.07mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.61mi0.34mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.23mi0.66mi
Number of structures placed in channel (C.4.d.7)
30.0026.00
Pools Created through channel structure placement (C.4.d.5)
15.0012.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
2.00acres0.10acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.23mi0.03mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
2.00acres0.10acres
Miles of streambank planted (C.5.c.4)
0.23mi0.03mi