WRIA 32 General
#32 Basinwide #32 Basinwide
Organization Snake River Salmon Recovery Board Lead Entity
Sponsor
Status Active
Schedule Start Date: 3/1/2001 End Date: 9/30/2027
Category Category: 
DESCRIPTION
This category is for WRIA 32 projects crossing multiple spawning aggregations and/or non-priority areas. For reporting on the entire WRIA (Watershed) see the Level 1 Project 'WRIA 32 Walla Walla Habitat Restoration and Protection'.

This category includes four MSA's with the following habitat factors and objectives:

Mainstem Walla Walla River MSA
Threats: Fish Screens, Passage Barriers, Low/Dewatered Streams
I.Temperature: not more than 4 days above 72ºF
II.Large Woody Debris: 0.5 to 1 pieces per channel width
III.Embeddedness: less than 10% embeddedness
IV.Riparian Function: 40 to 90% of maximum
V.Channel Confinement: reduce to 40% to 60% of stream length

Mill Creek MSA
Imminent Threats: Fish Passage Barriers (including gravel berms), Fish Screens, Low/Dewatered Streams
I.Turbidity: Protect existing condition
II.Temperature: Protect existing condition
III.Large Woody Debris: Protect existing condition
IV.Riparian: Protect existing condition

Middle Touchet River MSA (mainstem from Coppei creek to Patit Creek)
Imminent Threats: Fish Screens, Fords, Low Stream Flows, Gravel Berms
I.Embeddedness: Less than 10%
II.Temperature: No more than 4 days above 72ºF
III.Large Woody Debris: 1 piece per channel width
IV.Confinement: 15 to 40% of streambank length

Upper Touchet River MSA (Patit Creek upstream to Touchet headwaters)
Imminent Threats: Fish Screens, Fords, Low Stream Flows, Gravel Berms
I.Temperature: No more than 4 days above 72ºF
II.Riparian: 62 to 82% of maximum
III.Large Woody Debris: 1 to 2 pieces per channel width
IV.Confinement: 10 to 40% of streambank length
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR
SECONDARY SPONSOR CONTACT
POTENTIAL SPONSOR
ALT PROJECT CONTACT
PROJECT MANAGER
LANDOWNER
PHOTOS

 
View project on a larger map

Related Projects