Klickitat Floodplain Restoration Phase 5
#13-1401 #13-1401
Organization Klickitat Lead Entity
Sponsor Columbia Land Trust
Status Completed
Schedule Start Date: 12/4/2013 End Date: 10/27/2017
Category Category: Restoration
DESCRIPTION
The Klickitat Floodplain Restoration Phase 5 project will enhance and restore riparian and floodplain habitat between river miles 20.55 and 22.45 of the Klickitat River, as well as provide for weed control/site prep for the phase 6 project area located between the washouts and Dead Canyon Creek, and for continued maintenance (weed control/plant maintenance) in the phase 2-4 project areas. This portion of the river has the greatest habitat complexity of any reach in the lower Klickitat River and provides critical spawning, migration and rearing habitat for winter and summer steelhead (ESA-Threatened), spring and fall Chinook salmon, and coho salmon. The project addresses limiting habitat features and processes identified in the 2013 Klickitat Lead Entity Salmon Recovery Strategy for this reach by fill removal and pullback of floodplain road to restore connectivity, establish river contact with bedrock, and soften channel boundary along 1.79 miles of road. Treated areas will be revegetated with native species to enhance riparian vegetation and improve near-bank and off-channel habitat conditions for steelhead and salmon. Phase 5 continues SRFB funded work initiated in 2004 with the acquisition of the haul road and four phases of restoration. This is the last proposed phase for the southern portion of the road; future phases would occur between the north end of Phase 2 and Dead Canyon Creek.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/16/2013Columbia Land TrustMatch$85,000.00
Requested08/16/2013Recreation and Conservation Office (RCO)Salmon State Projects$477,650.00
Allocated10/27/2017Columbia Land TrustMatch$94,700.00
Allocated10/27/2017Recreation and Conservation Office (RCO)Salmon Federal Projects$536,649.98
Spent10/27/2017Columbia Land TrustMatch-$94,700.00
Spent10/27/2017Recreation and Conservation Office (RCO)Salmon Federal Projects-$536,649.98
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
Not entered $562,650.00 $631,349.98 $631,349.98 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Middle Columbia River Spring, Not Warranted
Chum-Pop (ESU):Chum-Columbia River, Upper Gorge Tributaries, Outside anadromous area
County:Klickitat
HUC12:Beeks Canyon-Klickitat River (170701060402)
HUC8:Klickitat (17070106)
Lead Entity Area:Klickitat County
Legislative District:14
Salmon Recovery Regions:Middle Columbia River
Sections:05
Steelhead-Pop (ESU):Steelhead-Middle Columbia River, Klickitat River, Threatened
Township:T04NR14E
Watershed Administrative Unit:Dead Canyon
WRIA:Klickitat
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
1.90mi6.10mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.03mi1.02mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
1.90acres6.00acres
Instream Pools Created/Added (C.4.c.6)
0.003.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi0.13mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
1.03mi1.02mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.10acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.03mi0.01mi
Number of structures placed in channel (C.4.d.7)
1.001.00
Pools Created through channel structure placement (C.4.d.5)
1.001.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
10.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
18.40acres38.60acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
1.90mi6.10mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
17.10acres9.90acres
Miles of streambank planted (C.5.c.4)
1.76mi0.77mi
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
38.60acres38.60acres
Miles of streambank treated for plant removal/control (C.5.h.4)
6.10mi6.10mi