Entiat Instream Habitat Improvements
#05-1591 #05-1591
 Entiat Sub-basin Lower Entiat Entiat Instream Habitat Improvements
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Chelan County Natural Resources Department
Status Completed
Schedule Start Date: 3/1/2006 End Date: 6/3/2008
Category Category: Restoration
Project Photo
DESCRIPTION
The Chelan County Natural Resources Department (CCNRD) and Cascadia Conservation District (CCD) have implemented the Entiat Instream Habitat Improvement Project. This project was identified in the "aquatic habitat recommendations" contained in the Entiat WRIA 46 Management Plan, specifically Entiat Ecosystem Diagnosis and Treatment Analysis (EDT), Alternative Management Scenario 1 and 5. The cross vane installations in the lower Entiat is intended to increase the amount of pool habitat, increase LWD loading, reduce channel confinement, and restore a measure of riparian function. These measures are consistent with the Entiat WRIA 46 Management Plan "diagnoses" for Entiat spring and late-run Chinook. The Entiat Instream Habitat Improvement Project was constructed in two separate locations in the mainstem Entiat River: Hanan Detwiler and Milne (See Hanan-Detwiler page for details on that project). The Milne project entailed the installation of a five rock barbs, one diversion barb structure with sluice-gate, thirteen large logs with root-wads, and six boulder clusters with five boulders each. The diversion barb will be used to convey water to the irrigation ditch and replaces the push-up dam created annually by the orchardist. The sluice-gate was installed to assist in reducing the amount of sediment that accumulates in the irrigation ditch. Large wood structures which were installed from RM 2.55 - 2.75.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/30/2005Chelan County Natural Resources DepartmentMatch$37,500.00
Requested09/30/2005Recreation and Conservation Office (RCO)Salmon State Projects$212,500.00
Allocated05/01/2008Chelan County Natural Resources DepartmentMatch$40,801.00
Allocated05/01/2008Recreation and Conservation Office (RCO)Salmon Federal Projects$231,203.00
Spent06/03/2008Chelan County Natural Resources DepartmentMatch-$40,801.00
Spent06/03/2008Recreation and Conservation Office (RCO)Salmon Federal Projects-$231,203.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$97,000.00 $250,000.00 $272,004.00 $272,004.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Entiat River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Mills Creek-Entiat River (170200100209)
HUC8:Upper Columbia-Entiat (17020010)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:13
Sections:33
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Entiat River, Threatened
Township:T25NR20E
Township:T26NR20E
Upper Columbia Assesment Unit:Entiat River-Mills Creek
Watershed Administrative Unit:Lower Entiat
WRIA:Entiat
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.22mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
4.00mi0.22mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
2.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.22mi
Number of structures placed in channel (C.4.d.7)
28.00
Pools Created through channel structure placement (C.4.d.5)
26.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.00mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.00mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.00acres