Entiat Instream Habitat Improvements
#05-1591 #05-1591
 Entiat Sub-basin Lower Entiat Entiat Instream Habitat Improvements
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Chelan County Natural Resources Department
Status Completed
Schedule Start Date: 3/1/2006 End Date: 6/3/2008
Priority 1
Category Category: Restoration
Project Photo
DESCRIPTION
The Chelan County Natural Resources Department (CCNRD) and Cascadia Conservation District (CCD) have implemented the Entiat Instream Habitat Improvement Project. This project was identified in the "aquatic habitat recommendations" contained in the Entiat WRIA 46 Management Plan, specifically Entiat Ecosystem Diagnosis and Treatment Analysis (EDT), Alternative Management Scenario 1 and 5. The cross vane installations in the lower Entiat is intended to increase the amount of pool habitat, increase LWD loading, reduce channel confinement, and restore a measure of riparian function. These measures are consistent with the Entiat WRIA 46 Management Plan "diagnoses" for Entiat spring and late-run Chinook. The Entiat Instream Habitat Improvement Project was constructed in two separate locations in the mainstem Entiat River: Hanan Detwiler and Milne (See Hanan-Detwiler page for details on that project). The Milne project entailed the installation of a five rock barbs, one diversion barb structure with sluice-gate, thirteen large logs with root-wads, and six boulder clusters with five boulders each. The diversion barb will be used to convey water to the irrigation ditch and replaces the push-up dam created annually by the orchardist. The sluice-gate was installed to assist in reducing the amount of sediment that accumulates in the irrigation ditch. Large wood structures which were installed from RM 2.55 - 2.75.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/30/2005Chelan Co Natural ResourceMatch$37,500.00
Requested09/30/2005Recreation and Conservation OfficeSalmon State Projects$212,500.00
Allocated05/01/2008Chelan Co Natural ResourceMatch$40,801.00
Allocated05/01/2008Recreation and Conservation OfficeSalmon Federal Projects$231,203.00
Spent06/03/2008Chelan Co Natural ResourceMatch-$40,801.00
Spent06/03/2008Recreation and Conservation OfficeSalmon Federal Projects-$231,203.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$97,000.00 $250,000.00 $272,004.00 $272,004.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PROJECT CONTACT
GRANT MANAGER
PARTNER
PROJECT MANAGER
SPONSOR
PHOTOS

 
LOCATION
Legislative District 2022:12
Sections:13
County:Chelan
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Entiat River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
WRIA:Entiat
HUC12:Mills Creek-Entiat River (170200100209)
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Entiat River, Threatened
Township:T25NR20E
Lead Entity Area:Upper Columbia
Salmon Recovery Regions:Upper Columbia River
HUC8:Upper Columbia-Entiat (17020010)
View project on a larger map
ACTIVITY-INSTREAM HABITAT PROJECT PCSRF
Total Miles Of Instream Habitat Treated
6%
0.22 Actual
4 Planned
Miles
Miles of Streambank StabilizedNot entered
Number of structures placed in channel 28 Number
ACTIVITY-RIPARIAN HABITAT PROJECT PCSRF
* Total Riparian Acres TreatedNot entered
* Total Riparian Miles Streambank TreatedNot entered
Acres Planted in riparianNot entered
ADDITIONAL INFORMATION