Below the Keystone Bridge - Riparian Planting
#08-2186 #08-2186
 Entiat Sub-basin Lower Entiat Below the Keystone Bridge - Riparian Planting
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Cascadia Conservation District
Status Completed
Schedule Start Date: 1/15/2009 End Date: 2/14/2012
Priority 3
Category Category: Restoration
Project Photo
DESCRIPTION
This project addresses the lack of habitat diversity by constructing several instream structures and by planting/under planting riparian zone vegetation. The riparian planting will also help moderate Entiat River water temperature extremes. Additionally, the existing surface water diversion which acts as a fish passage barrier was replaced with a new diversion screen and bypass to meet ESA compliance standards to ensure safe juvenile salmonid passage exists.In spring 2011, maintenance included manually removing invasive weeds such as Russian thistle, tumble mustard, and spotted and diffuse knapweed, as well as clematis vine which have invasive characteristics, and additional mulch applied to plantings.In fall 2011, maintenance consisted of gently up-rooting all conifer trees within the first 30 feet of the stream bank and replanting outside active ice flow/accumulation area. Conifers were replaced with approximately 1000 live-stake cuttings from willow spp. and red osier dogwood shrubs found on adjacent site. Also, all project areas were back filled with additional plants to replace any plants that had not survived the summer 2011 growing season.The goal of the project is to restore native riparian vegetation along salmon bearing streams. The objective of the project is to restore natural streamside vegetation, improve stream temperature, reduce erosion, filtration, and recruit large woody debris.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/13/2009Salmon Recovery Funding BoardSalmon State Projects$42,625.00
Requested07/13/2009Cascadia Conservation DistrictMatch$43,378.00
Allocated02/03/2012Salmon Recovery Funding BoardSalmon Federal Projects$18,848.15
Allocated02/03/2012Cascadia Conservation DistrictMatch$31,273.85
Spent02/03/2012Salmon Recovery Funding BoardSalmon Federal Projects-$18,848.15
Spent02/03/2012Cascadia Conservation DistrictMatch-$31,273.85
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$594,000.00 $86,003.00 $50,122.00 $50,122.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PROJECT CONTACT
GRANT MANAGER
LAND OWNER
PARTNER
SPONSOR
PHOTOS

 
LOCATION
Legislative District 2022:12
Sections:18
County:Chelan
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Entiat River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
WRIA:Entiat
HUC12:Mills Creek-Entiat River (170200100209)
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Entiat River, Threatened
Township:T25NR21E
Lead Entity Area:Upper Columbia
Salmon Recovery Regions:Upper Columbia River
HUC8:Upper Columbia-Entiat (17020010)
View project on a larger map

Related Projects

ACTIVITY-INSTREAM HABITAT PROJECT PCSRF
Number of structures placed in channel
100%
10 Actual
10 Planned
Number
Total Miles Of Instream Habitat Treated
100%
0.1 Actual
0.1 Planned
Miles
ACTIVITY-RIPARIAN HABITAT PROJECT PCSRF
* Total Riparian Acres Treated
100%
5.5 Actual
5.5 Planned
Acres
* Total Riparian Miles Streambank Treated
100%
0.8 Actual
0.8 Planned
Miles
Acres of riparian treated for plant removal/controlNot entered
Acres Planted in riparian 05.5 Acres