Entiat R. BridgeToBridge Reach Rest. Ph1
#04-1503 #04-1503
 Entiat Sub-basin Lower Entiat Entiat R. BridgeToBridge Reach Rest. Ph1
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Cascadia Conservation District
Status Completed
Schedule Start Date: 1/3/2005 End Date: 5/30/2008
Category Category: Restoration
Project Photo
DESCRIPTION
Phase I of the B2B project included the construction of a cross vane which spans the entire main channel of the Entiat River. The cross vane is constructed of large boulders and incorporates large woody debris. The cross vane creates pool habitat and maintains the pool habitat through scour during high flows. The project also included improvements to make an adjacent irrigation intake water tight to allow flow through the canal year-round, as opposed to seasonal dewatering of the canal to coincide with the irrigation season and prevent damage to the intake pipe from freezing. Other improvements to the irrigation canal outfall have also been made to make the outfall more fish friendly.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/16/2004Cascadia Conservation DistrictMatch$20,451.00
Requested07/16/2004Recreation and Conservation Office (RCO)Salmon State Projects$102,555.00
Allocated12/03/2004Cascadia Conservation DistrictMatch$20,451.00
Allocated12/03/2004Recreation and Conservation Office (RCO)Salmon Federal Projects$102,555.00
Spent05/30/2008Cascadia Conservation DistrictMatch-$20,451.00
Spent05/30/2008Recreation and Conservation Office (RCO)Salmon Federal Projects-$102,555.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$185,000.00 $123,006.00 $123,006.00 $123,006.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Entiat River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Mills Creek-Entiat River (170200100209)
HUC8:Upper Columbia-Entiat (17020010)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:13
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Entiat River, Threatened
Township:T25NR20E
Upper Columbia Assesment Unit:Entiat River-Mills Creek
Watershed Administrative Unit:Lower Entiat
WRIA:Entiat
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.20mi0.20mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.13mi0.13mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.20acres
Instream Pools Created/Added (C.4.c.6)
4.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.13mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.32mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.15mi
Number of structures placed in channel (C.4.d.7)
2.00
Pools Created through channel structure placement (C.4.d.5)
4.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
10.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.00mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.60acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.19mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.60acres
ADDITIONAL INFORMATION