Jon Small Off-Channel Rearing Pond
#00-1167 #00-1167
 Entiat Sub-basin Lower Entiat Jon Small Off-Channel Rearing Pond
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Trout Unlimited Icicle Valley
Status Completed
Schedule Start Date: 5/1/2000 End Date: 7/7/2006
Category Category: Restoration
Project Photo
DESCRIPTION
Trout Unlimited along with project partners assisted a private landowner with the creation of high quality, year-round off-channel salmon and steelhead rearing habitat on WDFW owned land adjacent the mainstem Entiat River. The project created an off-channel rearing pond, a meandering 1000 ft. rearing channel exiting the pond and connecting to the Entiat River, and restored 1000 ft. of previously channelized and degraded rearing habitat and eroding banks through bioengineering and placement of instream rock and fish habitat structures. The project benefited endangered spring chinook salmon, endangered summer steelhead trout and other anadromous and resident salmonids (including threatened resident bull trout) within the lower Entiat River drainage. Lack of juvenile rearing habitat (overwintering) is the most limiting factor within the Entiat watershed. Project cooperators include WDFW, USFS, Chelan County Public Works Dept. and others.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested02/03/2000Trout Unlimited Icicle ValleyMatch$62,091.00
Requested02/03/2000Recreation and Conservation Office (RCO)Salmon State Projects$134,170.00
Allocated01/18/2007Trout Unlimited Icicle ValleyMatch$62,091.00
Allocated01/18/2007Recreation and Conservation Office (RCO)Salmon State Projects$133,751.01
Spent01/18/2007Trout Unlimited Icicle ValleyMatch-$62,091.00
Spent01/18/2007Recreation and Conservation Office (RCO)Salmon State Projects-$133,751.01
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$195,842.00 $196,261.00 $195,842.01 $195,842.01 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Entiat River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Mills Creek-Entiat River (170200100209)
HUC8:Upper Columbia-Entiat (17020010)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:10
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Entiat River, Threatened
Township:T25NR20E
Upper Columbia Assesment Unit:Entiat River-Mills Creek
Watershed Administrative Unit:Lower Entiat
WRIA:Entiat
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.50mi0.50mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.19mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.50mi0.50mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.40acres
Instream Pools Created/Added (C.4.c.6)
1.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.19mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.19mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.40acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.19mi
Number of structures placed in channel (C.4.d.7)
6.00
Pools Created through channel structure placement (C.4.d.5)
1.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
 Plant removal/control (C.4.g.1)    
Acres of Streambed Treated for plant removal/control (C.4.g.4)
0.00acres
Miles of Stream Treated for plant removal/control (C.4.g.3)
0.00mi
 Spawning gravel placement (C.4.f.1)    
Cubic Yards of spawning gravel placed (C.4.f.3)
0.00cubic yds
Miles of Stream Treated with spawning gravel placement (C.4.f.2)
0.00mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.10mi0.10mi
Wetland Project    
Total Acres Of Wetland Area Treated (C.8.b)
0.00acres0.00acres
 Artificial wetland created (C.8.f.1)    
Artificial Wetland Acres Created (C.8.f.2)
0.20acres0.20acres
 Wetland plant removal / control (C.8.d.1)    
Acres of wetland treated for plant removal/control (C.8.d.3)
0.00acres0.00acres
ADDITIONAL INFORMATION