CCD Entiat Canal Log Boom Installation
#SRP-08-10695 #SRP-08-10695
 Entiat Sub-basin Lower Entiat CCD Entiat Canal Log Boom Installation
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Cascadia Conservation District
Status Completed
Schedule Start Date: 4/10/2008 End Date: 6/30/2009
Category Category: Restoration
Project Photo
DESCRIPTION
This project fabricated, constructed and installed the log boom (as designed and permitted) at the orifice of the Entiat PUD Canal.

Modification to Entiat Bridge-to-Bridge Reach Restoration, Phase 1 project. The constructed design for the Bridge-to-Bridge juvenile off-channel habitat enhancement in the irrigation canal was based on the assumption that the water level in the canal remained elevated at the same level during the non-irrigation season, and actions would improve year-round off-channel conditions for juveniles.

Since construction of the cross vane and orifice structure, large woody debris will clog the entrance to the canal at the orifice, especially during higher spring flows. The installation of this proposed log boom structure will reduce the amount of maintenance needed to ensure fish friendly flows into the canal system. The log boom will also deter woody debris from the potentially dislodging the orifice structure and habitat structures placed in the entrance/side channel of the canal.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested12/30/2008Chelan County Public Utilities DistrictRocky Reach HCP Tributary Fund$7,160.00
Allocated12/30/2008Chelan County Public Utilities DistrictRocky Reach HCP Tributary Fund$7,160.00
Spent12/30/2008Chelan County Public Utilities DistrictRocky Reach HCP Tributary Fund-$7,160.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$7,160.00 $7,160.00 $7,160.00 $7,160.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Entiat River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Mills Creek-Entiat River (170200100209)
HUC8:Upper Columbia-Entiat (17020010)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:14
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Entiat River, Threatened
Township:T25NR20E
Upper Columbia Assesment Unit:Entiat River-Mills Creek
Watershed Administrative Unit:Lower Entiat
WRIA:Entiat