North Meander Reconnection - Wood Placement
# 14-1289 # 14-1289
Organization Stillaguamish River Salmon Recovery Co-Lead Entity
Sponsor Snohomish County Public Works
Status Dormant
Schedule Start Date: 9/19/2014 End Date: 12/30/2016
Category Category: Restoration
DESCRIPTION
The proposed project was developed through the implementation of Snohomish County's Operations and Adaptive Management Plan for the North Meander Channel Reconnection Project-Stillaguamish River. This plan was developed to monitor and provide a framework for future management activities such as sediment removal, erosion control, vegetation management, and large woody material (LWM) augmentation. The project would provide a baseline mapping effort to characterize the existing conditions of channel to compare with previous efforts. Channel profile, existing LWM locations and condition, access, and potential LWM placement locations would be documented. We estimate that 3 to 7 potential LWM placement locations would be identified each containing 10 to 20 wood elements. Based on the baseline mapping effort we would develop designs for anchored LWM placement. These designs would include interwoven logs and logs with rootwads either ballasted with boulders or fastened with mechanical anchors. The intent of the design is to provide general layout of individual structures while providing the maximum flexibility of field fitting individual structures. The designs would contain woody elements and rootwads that engage water at all flow conditions. Such designs maximize the habitat value for each structure. In addition, the baseline mapping effort would provide guidance for sediment maintenance identified in the Adaptive Management Plan.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested05/23/2014Snohomish County Public WorksMatch$27,750.00
Requested05/23/2014Recreation and Conservation Office (RCO)Salmon State Projects$157,250.00
Allocated02/16/2017Snohomish County Public WorksMatch$8,898.01
Allocated02/16/2017Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$50,422.02
Spent11/17/2016Snohomish County Public WorksMatch-$8,898.01
Spent11/17/2016Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$50,422.02
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$150,000.00 $185,000.00 $59,320.03 $59,320.03 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, South Fork Stillaguamish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Silvana
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Snohomish
HUC12:Armstrong Creek-Stillaguamish River (171100080303)
HUC8:Stillaguamish (17110008)
Lead Entity Area:Stillaguamish River
Legislative District:10
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:01
Steelhead-Pop (ESU):Steelhead-Puget Sound, Stillaguamish River, Threatened
Township:T31NR04E
Watershed Administrative Unit:Stillaguamish Flats
WRIA:Stillaguamish
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.60mi0.00mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.60mi0.00mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.02mi0.00mi
Number of structures placed in channel (C.4.d.7)
5.000.00
Pools Created through channel structure placement (C.4.d.5)
5.000.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
0.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
2.50acres0.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
1.20mi0.00mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
3.00acres0.00acres
Miles of streambank planted (C.5.c.4)
1.20mi0.00mi
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
0.20acres0.00acres
Miles of streambank treated for plant removal/control (C.5.h.4)
0.02mi0.00mi