North Meander Reconnection, Phase II
# 05-1605 # 05-1605
Organization Stillaguamish River Salmon Recovery Co-Lead Entity
Sponsor Snohomish County
Status Completed
Schedule Start Date: 1/6/2006 End Date: 5/18/2010
Category Category: Restoration
Project Photo
DESCRIPTION
The North Meander Reconnection Project, completed in 2010, provides 3100 feet of off-channel rearing habitat for juvenile salmonids in the mainstem Stillaguamish River. Almost 70% of the off-channel rearing habitat in the mainstem has been lost due to the construction of levees and revetments, and the removal of gravel and LWD. Historically these side channels provided key areas for Chinook and coho juveniles to rear. The North Meander is a river bend cut off by a channel straightening project on Cook Slough in the 1930s. The upper end was plugged and over time the lower end filled in with sediments, eventually leaving a depressional wetland with no hydraulic connection to the river. The project consists of a box culvert inlet from Cook Slough, excavation of an inlet channel to connect to the upper end of the meander, excavation of the meander, and connection of an outlet to the Stillaguamish River. Extensive LWD placement, including 2 jams at the inlet and outlet, and reforestation were also included.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/30/2005Snohomish CountyMatch$180,000.00
Requested09/30/2005Recreation and Conservation Office (RCO)Salmon State Projects$245,400.00
Allocated01/06/2006Snohomish CountyMatch$180,000.00
Allocated01/06/2006Recreation and Conservation Office (RCO)Salmon Federal Projects$245,400.00
Spent05/18/2010Snohomish CountyMatch-$180,000.00
Spent05/18/2010Recreation and Conservation Office (RCO)Salmon Federal Projects-$245,400.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$425,400.00 $425,400.00 $425,400.00 $425,400.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, South Fork Stillaguamish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Silvana
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Snohomish
HUC12:Armstrong Creek-Stillaguamish River (171100080303)
HUC8:Stillaguamish (17110008)
Lead Entity Area:Stillaguamish River
Legislative District:10
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:01
Steelhead-Pop (ESU):Steelhead-Puget Sound, Stillaguamish River, Threatened
Township:T31NR04E
Watershed Administrative Unit:Stillaguamish Flats
WRIA:Stillaguamish
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.63mi0.54mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.54mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
0.00cfs
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
2.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.63mi0.54mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
4.30acres
Instream Pools Created/Added (C.4.c.6)
11.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.54mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.54mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
3.20acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.54mi
Number of structures placed in channel (C.4.d.7)
23.00
Pools Created through channel structure placement (C.4.d.5)
3.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
20.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.01mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
3.90acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.54mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
3.90acres
Wetland Project    
Total Acres Of Wetland Area Treated (C.8.b)
4.60acres4.30acres
 Artificial wetland created (C.8.f.1)    
Artificial Wetland Acres Created (C.8.f.2)
1.60acres4.30acres
 Wetland plant removal / control (C.8.d.1)    
Acres of wetland treated for plant removal/control (C.8.d.3)