North Meander Slough Reconnection
# 01-1307 # 01-1307
Organization Stillaguamish River Salmon Recovery Co-Lead Entity
Sponsor Snohomish County
Status Completed
Schedule Start Date: 9/1/2002 End Date: 3/16/2007
Category Category: Restoration
DESCRIPTION
Snohomish County used this funding to reconnect North Meander Slough to the Stillaguamish River, enhancing and restoring natural habitat forming processes for creating off-channel rearing for juvenile salmonids. It involved removal of a plug dike, excavation of deposited material, channel reconfiguration, wood placement, and riparian planting. North Meander Slough, located along the lower mainstem, is a horseshoe shaped channel approx. 4,600 feet in length. Reconnecting the slough to the main channel restored over 3/4 mile of off-channel rearing and refuge habitat for juvenile salmonids and has a broad geographic effect because it created substantial off-channel rearing and refuge habitat, a multi-species limiting factor (WCC, 1999; Stilly TAG, 2000). Reconnecting the slough also provides foraging habitat for adult bull trout. Reconnecting the North Meander created 12 acres of off-channel rearing. Using this area and regional density estimates, we estimate the project provided rearing for approximately 4,200 pre-smolt chinook/year. Pess, et.al. (1999) estimated that reconnecting North and South Meander, another slough just upstream, creates as much or more rearing habitat than the top twenty culvert replacement projects in the Stilly.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested01/03/2002Recreation and Conservation Office (RCO)Salmon State Projects$679,000.00
Requested01/03/2002Snohomish CountyMatch$2,017,000.00
Allocated04/12/2002Snohomish CountyMatch$679,000.00
Allocated04/12/2002Recreation and Conservation Office (RCO)Salmon State Projects$679,000.00
Spent03/16/2007Snohomish CountyMatch-$679,000.00
Spent03/16/2007Recreation and Conservation Office (RCO)Salmon State Projects-$679,000.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,358,000.00 $2,696,000.00 $1,358,000.00 $1,358,000.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, South Fork Stillaguamish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Silvana
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Snohomish
HUC12:Armstrong Creek-Stillaguamish River (171100080303)
HUC8:Stillaguamish (17110008)
Lead Entity Area:Stillaguamish River
Legislative District:10
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:01
Steelhead-Pop (ESU):Steelhead-Puget Sound, Stillaguamish River, Threatened
Township:T31NR04E
Watershed Administrative Unit:Stillaguamish Flats
WRIA:Stillaguamish
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.90mi0.60mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.60mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.01sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
0.60mi
Number of bridges (C.2.g.2)
1.00
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.60mi
Number of culverts (C.2.f.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
2.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.60mi0.60mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
5.00acres
Instream Pools Created/Added (C.4.c.6)
6.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.60mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.60mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
5.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.60mi
Number of structures placed in channel (C.4.d.7)
300.00
Pools Created through channel structure placement (C.4.d.5)
6.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
3.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.00mi
Wetland Project    
Total Acres Of Wetland Area Treated (C.8.b)
4.60acres4.60acres
 Wetland improvement/ restoration (C.8.e.1)    
Acres of wetland Improved/Restored (C.8.e.2)
4.60acres
 Wetland plant removal / control (C.8.d.1)    
Acres of wetland treated for plant removal/control (C.8.d.3)
4.60acres4.60acres