South Fork Floodplain Restoration PH 2B Const
#14-1180 #14-1180
 WRIA 10 Puyallup River Mainstem South Fork Floodplain Restoration PH 2B Const
Organization Puyallup and Chambers Watershed Salmon Recovery Lead Entity
Sponsor Pierce County Planning and Public Works SWM
Status Completed
Schedule Start Date: 9/18/2014 End Date: 3/20/2019
Category Category: Restoration
Project Photo
DESCRIPTION
Major completed construction features and items include the 792 Lin-Ft of major floodplain side channel that was excavated and established. This constructed floodplain side channel provided the final connection to the existing side channel segment that was built in previous phases of the South Fork Floodplain Restoration project. The completed side channel excavation work also completed the side channel downstream outlet connection to the Puyallup River main stem. Side channel excavation for this Phase 2B project totaled 28,600 CY. The project also included construction and installation of thirty five Engineered Log Jams (fiver difference class types) structures within the excavated side channel feature. Numerous pieces and clusters of floodplain roughness features were installed, which totaled more than fifty. Completed work also included installation of structures to intercept and convey runoff from the steep slope hillside. Compacted embankment material was placed which totaled 1,945 CY of excavated native material. Seeding and planting of disturbed areas of the project site was also completed. A Verizon fiber optic cable and high pressure gas main were relocated to the perimeter access road, which removed the utilities from the lower floodplain area of the project site. This allowed for the construction of the major side channel feature without interfering with the utility lines. The gas main completed work included relocation of 1,280 Lin-Ft gas piping, trenching, backfill and two intercept connections. The fiber optic cable completed work included relocation of 2,250 Lin-Ft for cable, trenching, two utility splice connection vaults and associated backfill. Overall, about 3.3 Ac of riparian floodplain corridor was restored as part of this phase of the project.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested06/27/2014Pierce County Planning and Public Works SWMMatch$273,773.00
Requested06/27/2014Recreation and Conservation Office (RCO)Salmon State Projects$1,007,884.00
Allocated09/26/2014Recreation and Conservation Office (RCO)Salmon Federal Projects$225,628.00
Allocated09/26/2014Pierce County Planning and Public Works SWMMatch$273,773.00
Allocated09/26/2014Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$782,256.00
Spent08/03/2018Recreation and Conservation Office (RCO)Salmon Federal Projects-$225,628.00
Spent03/20/2019Pierce County Planning and Public Works SWMMatch-$273,773.00
Spent03/20/2019Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$782,256.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,281,657.00 $1,281,657.00 $1,281,657.00 $1,281,657.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Puyallup River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:McMillin
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Pierce
HUC12:Fiske Creek-Puyallup River (171100140205)
HUC8:Puyallup (17110014)
Lead Entity Area:Pierce County
Legislative District:25
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:13
Steelhead-Pop (ESU):Steelhead-Puget Sound, Puyallup River/Carbon River, Threatened
Township:T19NR04E
Watershed Administrative Unit:Electron
WRIA:Puyallup - White
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.15mi0.15mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.15mi0.15mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
1.30acres1.30acres
Instream Pools Created/Added (C.4.c.6)
1.002.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.15mi0.15mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.15mi0.15mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
1.30acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.15mi0.15mi
Number of structures placed in channel (C.4.d.7)
23.0036.00
Pools Created through channel structure placement (C.4.d.5)
1.002.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
12.00yd