Barnabee Farms Springbrook Creek Restoration
#21-1542 #21-1542
Organization West Sound Partners for Ecosystem Recovery
Sponsor Bainbridge Island Land Trust
Status Active
Schedule Start Date: 1/15/2025 End Date: 10/31/2027
Category Category: Restoration
DESCRIPTION
The Barnabee Farm Springbrook Stream Restoration project will result in a final engineered design, permitting and removal of a 67% fish passage barrier undersized culvert, over 80 linear feet of rock armor on Springbrook Creek, a stream federally designated as critical habitat for ESA threated Puget Sound Steelhead, and stream recontouring. A bridge crossing will be installed, large wood will be installed along the bank and native vegetation will be installed along the stream where armor is removed. The Barnabee Farm project takes place on private land at stream mile 0.39 and was identified in the Springbrook Creek Watershed Assessment (SCWA) (Project 14-1547) as the second highest priority stream restoration project to: address fish access to over 3.76 miles of upstream fish habitat; widen this section of channel to reflect natural stream conditions; improve connectivity between intact stream reaches adjacent to the existing undersized culvert; allow the stream to withstand anticipated higher flows anticipated in a changing climate; and allow for wood and sediment transport. Using the conceptual design developed by Wild Fish Conservancy (WFC) as part of the SCWA, a final design will be developed in consultation with the landowner, WFC, and other stakeholders working in the watershed, permitting will be completed, a construction bid package will be developed, and construction will be implemented.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested01/13/2022Bainbridge Island Land TrustMatch$175,109.00
Requested01/13/2022Recreation and Conservation Office (RCO)BA Fish Barrier Removal Board$200,000.00
Allocated01/15/2025Bainbridge Island Land TrustMatch$37,550.00
Allocated01/15/2025Recreation and Conservation Office (RCO)BA Fish Barrier Removal Board$200,000.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
Not entered $375,109.00 $237,550.00 $0.00 $237,550.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Bainbridge Island
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Kitsap
HUC12:Bainbridge Island (171100190404)
HUC8:Puget Sound (17110019)
Lead Entity Area:West Sound
Legislative District:23
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:North Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:20
Steelhead-Pop (ESU):Steelhead-Puget Sound, East Kitsap Peninsula Tributaries, Threatened
Township:T25NR02E
Watershed Administrative Unit:Bainbridge Island
WRIA:Kitsap
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FBRB)
3.76mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
3.76mi
Number of bridges (C.2.g.2)
1.00