DESCRIPTION
The action will replace Erlands Point Road bridge with a wider span and reduce floodplain constriction. Fill material composing the existing road embankment would be removed. The property immediately upstream includes residential development on artificial fill that encroaches into the stream corridor and impairs natural processes. The bridge project should be coordinated as part of a more comprehensive project that includes channel and floodplain constraints created by residential development along Shadden Lane NW.
Artificial fill brought in to construct the road embankment encroaches into the floodplain on both sides of channel (Figure 48 and Figure 49). The bridge crossing confines the stream corridor and
FUNDING
Proposed Cost |
|
Requested Funds |
|
Allocated Funds |
|
Spent Funds |
|
Balance |
|
PHOTOS
LOCATION
Sections: | 05 |
Legislative District: | 35 |
HUC12: | Chico Creek-Frontal Sinclair Inlet (171100190705) |
Chinook-Pop (ESU): | Chinook-Puget Sound, Threatened |
Chum-Pop (ESU): | Chum-Puget Sound/Strait of Georgia, Not Warranted |
Coho-Pop (ESU): | Coho-Puget Sound/Strait of Georgia, Species of Concern |
City Areas: | Erlands Point-Kitsap Lake |
WRIA: | Kitsap |
County: | Kitsap |
Puget Sound Action Areas: | North Central Puget Sound |
Pink-Pop (ESU): | Pink-Odd Year, Not Warranted |
Salmon Recovery Regions: | Puget Sound |
HUC8: | Puget Sound (17110019) |
Steelhead-Pop (ESU): | Steelhead-Puget Sound, East Kitsap Peninsula Tributaries, Threatened |
Township: | T24NR01E |
Lead Entity Area: | West Sound |