Organization | North Pacific Coast Lead Entity |
Sponsor | Wild Salmon Center |
Status | Active |
Schedule | Start Date: 6/1/2024 End Date: 8/31/2027 |
Category | Category: Restoration |
To restore ecological processes associated with the
formation of complex habitat features, Goodman
Creek Large Woody Debris (LWD) Placement – Phase 2
builds on restoration efforts implemented in 2021
through Goodman Creek LWD Placement (project 17-
1234), by placing large wood instream between RM
11.4 to 13.0. Project deliverables include final design
and strategically placed large wood structures
creating small, stable debris jams and thereby
increasing pool habitat and habitat diversity. A mix of
native conifers will be planted strategically along the
riparian corridor to enhance long-term restoration.
Segment 4 is a low gradient, low discharge channel
with good access, making large wood placement both
feasible and practical.
Type | Date | Funding Org | Funding Program | Match | Amount |
---|---|---|---|---|---|
Requested | 03/29/2023 | Wild Salmon Center | Match | $56,037.00 | |
Requested | 03/29/2023 | Recreation and Conservation Office (RCO) | Salmon State Projects | $317,537.00 | |
Allocated | 09/14/2023 | Wild Salmon Center | Match | $56,037.00 | |
Allocated | 09/14/2023 | Recreation and Conservation Office (RCO) | Salmon State Supplemental Sm | $317,537.00 | |
Spent | 04/24/2025 | Wild Salmon Center | Match | -$6,386.19 | |
Spent | 04/24/2025 | Recreation and Conservation Office (RCO) | Salmon State Supplemental Sm | -$36,187.70 |
Grant Project Agreement Totals | Proposed | Requested | Allocated | Spent | Balance |
$0.00 | $373,574.00 | $373,574.00 | $42,573.89 | $331,000.11 |
Type | Date | Funding Org | Funding Program | Match | Amount |
---|
Other Funding Totals | Proposed | Requested | Allocated | Spent | Balance |
Grand Totals | Proposed | Requested | Allocated | Spent | Balance |
Chinook-Pop (ESU): | Chinook-Washington Coast, Not Warranted |
Chum-Pop (ESU): | Chum-Pacific Coast, Not Warranted |
Coho-Pop (ESU): | Coho-Olympic Peninsula, Not Warranted |
County: | Jefferson |
HUC12: | Goodman Creek (171001010801) |
HUC8: | Hoh-Quillayute (17100101) |
Lead Entity Area: | North Pacific Coast |
Legislative District: | 24 |
Salmon Recovery Regions: | Washington Coast |
Sections: | 19 |
Sections: | 24 |
Steelhead-Pop (ESU): | Steelhead-Olympic Peninsula, Not Warranted |
Township: | T27NR12W |
Township: | T27NR13W |
Watershed Administrative Unit: | Goodman-Mosquito |
WRIA: | Soleduc |
APPLICATION | FINAL | ||||
RESTORATION METRICS | |||||
Miles of Stream and/or Shoreline Treated or Protected (C.0.b) | 1.60 | mi | |||
Instream Habitat Project | |||||
Total Miles Of Instream Habitat Treated (C.4.b) | 1.60 | mi | |||
Channel structure placement (C.4.d.1) | |||||
Miles of Stream Treated for channel structure placement (C.4.d.3) | 1.60 | mi | |||
Number of structures placed in channel (C.4.d.7) | 20.00 | ||||
Pools Created through channel structure placement (C.4.d.5) | 20.00 | ||||
Riparian Habitat Project | |||||
*Total Riparian Acres Treated (C.5.b.2) | 19.40 | acres | |||
*Total Riparian Miles Streambank Treated (C.5.b.1) | 3.20 | mi | |||
Planting (C.5.c.1) | |||||
Acres Planted in riparian (C.5.c.3) | 10.00 | acres | |||
Miles of streambank planted (C.5.c.4) | 1.00 | mi | |||
Upland Habitat And Sediment Project | |||||
Acres of Upland Habitat Area Treated (C.6.b.1) | 5.40 | acres | |||
Miles of Road Treated (C.6.b.2) | 4.50 | mi | |||
Upland vegetation management (C.6.h.1) | |||||
Acres Treated for upland vegetation management (C.6.h.3) | 5.40 | acres |