Lower Nason Creek Floodplain Design
#BPA-P-85957 #BPA-P-85957
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Chelan County Natural Resources Department
Status Completed
Schedule Start Date: 9/15/2020 End Date: 9/14/2021
Category Category: Planning & Restoration
DESCRIPTION
BPA Contract 85957. Under this contract Chelan County Natural Resource Department (CCNRD) will develop 30% conceptual designs for Nason Creek RM 2.5-3.4. We will evaluate the mainstem channel, floodplain and floodplain channels, and other adjacent lands and develop conceptual designs that address process deficiencies to improve in-stream conditions and better connect the floodplain and historical side channels. We propose to complete all work necessary to identify and analyze alternative restoration methods and prepare conceptual designs for the preferred alternative. We will hire a contract engineer and will, among other tasks, compile and assess existing data; collect and assess site data (e.g., land survey, characterize in-stream and wetland habitats, etc.); develop models (e.g., hydraulic, habitat suitability, geomorphic gradeline relative elevation, etc.); identify opportunities and constraints; and prepare conceptual engineering designs based on these efforts. Lower Nason Creek has been identified as a priority HUC12 Watershed for restoration actions supporting recovery of spring Chinook, steelhead and bull trout. Restoration actions that are likely to be implemented are known to positively influence habitats that support priority life stages of these species including adult holding, spawning/incubation, and summer and winter juvenile rearing. Restoration elements included in this design project are a subcontract to re-vegetate a previous project area (BPA-P-76713).
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/15/2020Bonneville Power Administration (BPA)Upper Columbia Programmatic$124,541.00
Allocated09/15/2020Bonneville Power Administration (BPA)Upper Columbia Programmatic$124,541.00
Spent09/14/2021Bonneville Power Administration (BPA)Upper Columbia Programmatic-$100,234.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$124,541.00 $124,541.00 $124,541.00 $100,234.00 $24,307.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Wenatchee River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Lower Nason Creek (170200110203)
HUC8:Wenatchee (17020011)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:03
Sections:04
Sections:09
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Wenatchee River, Threatened
Township:T26NR17E
Upper Columbia Assesment Unit:Lower Nason Creek
Watershed Administrative Unit:Lower Nason
WRIA:Wenatchee
View project on a larger map