DESCRIPTION
The Bremmer levee is located near RM 19.7 in the middle Entiat River. This restoration project removed the levee and activate a historic channel meander. Project implementation increase opportunities for channel migration with an average wavelength of 1,000 feet, increase the number and length of side channels and split flows, increase instream complexity and structure and increase hard points in channel and floodplain, and increase the density and age-class distribution of native riparian vegetation (Reclamation 2013, Stormy RA Update).
The Bremmer levee is located near RM 19.7 in the middle Entiat River. This restoration project proposes to breach and/or remove the levee and activate a historic channel meander. Project implementation will increase opportunities for channel migration with an average wavelength of 1000 feet, increase the number and length of side channels and split flows, increase instream complexity and structure and increase hard points in channel and floodplain, and increase the density and age-class distribution of native riparian vegetation (Reclamation 2013, Stormy RA Update).