 Wenatchee Sub-basin Chumstick Upper Chumstick Barrier Removal
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Chelan County Natural Resources Department
Status Completed
Schedule Start Date: 12/8/2011 End Date: 2/12/2014
Category Category: Restoration
Project Photo
DESCRIPTION
The Upper Chumstick Barrier Removal project improved migration conditions for salmonids to and from historical spawning and rearing habitat along the upper portion of Chumstick Creek (RM 7.3-9.8). This project corrected five fish passage barriers. Four (Saliby, Ott/Johnson, Baumann, and Cann) replaced a culvert with new bridges; one (Scheibler) replaced 3 rock barriers with 3 rock pool/chute fishways. Riparian planting was done at 4 worksites: Saliby, Ott/Johnson, Baumann, and Cann. This completed a 15 year effort to remove over 30 barriers within the first 9.8 miles of Chumstick Creek. In 2001, Cascadia Conservation District replaced 8 fish barrier culverts in Chumstick Creek. In 2009, Chelan County Public Works Department replaced the North Road culvert on Chumstick Creek. In 2009, CCNRD removed 17 fish barrier culverts and replaced them with 16 bridges. In 2010, CCNRD removed one more fish passage barrier, an irrigation diversion dam, located just north of the confluence with Sunitsch canyon. Due to development along the creek, a high concentration of stream crossings exist, some of which are barriers to salmonid migration. Barrier removal addressed two habitat limiting factors including up and downstream passage and riparian habitat. These are WDFW sites: 961007, 961008, 961009, 603555, 961010, 961011, 961012, 961013. Previously duplicated as SRP-09-15958 and SRP-09-16929
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/26/2011Chelan County Natural Resources DepartmentMatch$58,714.00
Requested08/26/2011Recreation and Conservation Office (RCO)Salmon State Projects$332,713.00
Allocated04/15/2013Chelan County Natural Resources DepartmentMatch$62,847.00
Allocated04/15/2013Recreation and Conservation Office (RCO)Salmon State Projects$356,122.00
Spent02/12/2014Chelan County Natural Resources DepartmentMatch-$62,847.00
Spent02/12/2014Recreation and Conservation Office (RCO)Salmon State Projects-$356,122.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$417,000.00 $391,427.00 $418,969.00 $418,969.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Wenatchee River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Chumstick Creek (170200110705)
HUC8:Wenatchee (17020011)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:06
Sections:31
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Wenatchee River, Threatened
Township:T25NR18E
Township:T26NR18E
Upper Columbia Assesment Unit:Chumstick Creek
Watershed Administrative Unit:Chumstick
WRIA:Wenatchee
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.04mi0.05mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
2.50mi3.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
7.00
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi0.00sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
2.50mi2.50mi
Number of bridges (C.2.g.2)
4.004.00
 Fishway chutes or pools installed (C.2.d.1)    
Number Of Fishway Chutes/Pools Installed (C.2.d.2)
3.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.17mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.02mi
Number of structures placed in channel (C.4.d.7)
18.00
Pools Created through channel structure placement (C.4.d.5)
12.00
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.02mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.80acres2.20acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.04mi0.18mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.80acres1.40acres