North Road Culvert
#08-1962 #08-1962
 Wenatchee Sub-basin Chumstick North Road Culvert
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Chelan County Natural Resources Department
Status Completed
Schedule Start Date: 1/1/2008 End Date: 10/31/2010
Priority 1
Category Category: Restoration
Project Photo
DESCRIPTION
The North Road culvert project replaced an existing 10 foot diameter partial fish passage barrier culvert with a bridge and natural stream channel to provide year-round passage to all fish species at all life stages. The project increases the spatial structure, abundance and productivity of listed Upper Columbia spring Chinook salmon and steelhead in the Wenatchee subbasin. The bridge facilitates the natural function of sediment and wood transport through the system. The project re-established migration corridor benefit Chinook, steelhead, resident redband rainbow trout, and re-introduced coho. The SRFB funds are match to a larger project. The Chelan County Public Works Department replaced the North Road Culvert over Chumstick Creek, along with a portion of the North Road, from Chumstick Highway to Fox Road (MP 0.05 to MP 0.56). Only the goals, objectives and budget for the North Road Culvert were included in this proposal. The goals, objectives and costs for the rest of the road project are not included.
Show more  ↓
FUNDING
Proposed Cost $1,818,779
Requested Funds $0
Allocated Funds $100,000
Spent Funds $0
Balance $100,000
FUNDING SOURCE
Chelan County$100,000
FUNDING SOURCES
PROJECT CONTACT
PARTNER
SPONSOR
PHOTOS

 
LOCATION
Sections:06
Legislative District:12
County:Chelan
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Wenatchee River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
HUC12:Chumstick Creek (170200110705)
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Wenatchee River, Threatened
Township:T24NR18E
Lead Entity Area:Upper Columbia
Salmon Recovery Regions:Upper Columbia River
WRIA:Wenatchee
HUC8:Wenatchee (17020011)
View project on a larger map
ACTIVITY-FISH PASSAGE IMPROVEMENT PCSRF
* Miles of Stream Made Accessible
100%
7 Actual
7 Planned
Miles
*Number of Blockages/Impediments/Barriers Impeding Passage
100%
1 Actual
1 Planned
Number
Number of bridges
100%
1 Actual
1 Planned
Number
ACTIVITY-INSTREAM HABITAT PROJECT PCSRF
Miles of Streambank Stabilized
100%
0.06 Actual
0.06 Planned
Miles
Total Miles Of Instream Habitat Treated
111%
0.1 Actual
0.09 Planned
Miles
SUBBASIN
Wenatchee
ADDITIONAL INFORMATION