North Road Culvert
#08-1962 #08-1962
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Chelan County Natural Resources Department
Status Completed
Schedule Start Date: 8/1/2008 End Date: 11/18/2011
Category Category: Restoration
Project Photo
DESCRIPTION
The North Road culvert project replaced an existing 10 foot diameter partial fish passage barrier culvert with a bridge and natural stream channel to provide year-round passage to all fish species at all life stages. The project increases the spatial structure, abundance and productivity of listed Upper Columbia spring Chinook salmon and steelhead in the Wenatchee subbasin. The bridge facilitates the natural function of sediment and wood transport through the system. The project re-established migration corridor benefit Chinook, steelhead, resident redband rainbow trout, and re-introduced coho. The SRFB funds are match to a larger project. The Chelan County Public Works Department replaced the North Road Culvert over Chumstick Creek, along with a portion of the North Road, from Chumstick Highway to Fox Road (MP 0.05 to MP 0.56). Only the goals, objectives and budget for the North Road Culvert were included in this proposal. The goals, objectives and costs for the rest of the road project are not included.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/08/2008Recreation and Conservation Office (RCO)Salmon State Projects$100,000.00
Requested08/08/2008Chelan County Natural Resources DepartmentMatch$1,718,779.00
Allocated12/11/2008Recreation and Conservation Office (RCO)Salmon Federal Projects$100,000.00
Allocated12/11/2008Chelan County Natural Resources DepartmentMatch$1,718,779.00
Spent03/26/2010Recreation and Conservation Office (RCO)Salmon Federal Projects-$100,000.00
Spent03/26/2010Chelan County Natural Resources DepartmentMatch-$1,718,779.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,818,779.00 $1,818,779.00 $1,818,779.00 $1,818,779.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Wenatchee River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Chumstick Creek (170200110705)
HUC8:Wenatchee (17020011)
Lead Entity Area:Upper Columbia
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:01
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Wenatchee River, Threatened
Township:T24NR17E
Upper Columbia Assesment Unit:Chumstick Creek
Watershed Administrative Unit:Derby
WRIA:Wenatchee
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.03mi0.10mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
2.14mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
105.00sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
2.14mi
Number of bridges (C.2.g.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.09mi0.10mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.06mi0.06mi