Spencer Island Estuary Restoration
#07-ER-008 #07-ER-008
Organization Snohomish Basin Lead Entity
Sponsor Ducks Unlimited - Vancouver (DEPRECATED)
Status Completed
Schedule Start Date: 1/1/2005 End Date: 3/27/2009
Category Category: Restoration
DESCRIPTION
Ducks Unlimited - Vancouver used this funding for the Spencer Island Estuary Restoration project, which connected isolated habitats to increase the range and distribution of salmon and increased salmonid access to tidelands and shorelines. The project site, owned by the Washington Department of Fish and Wildlife, is one mile east of Everett, Washington. Restoration on the site was accomplished by removing existing levees, filling drainage ditches, and re-establishing old tidal sloughs and channels. Specifically, the project: 1. Restored tidal processes on the northern portion of Spencer Island 2. Allowed fish access to the project site by breaching the levees, removing tidegates, and restoring tidal channel connections with Union Slough and Steamboat Slough 3. Restored wetland plant communities by re-establishing natural hydrological processes and planting native vegetation. 4. Provided highly productive rearing habitat for Chinook and other salmon by restoring approximately 400 acres of previously unavailable estuarine wetlands 5. Improved floodplain function in the lower Snohomish River by increasing capacity through removing dikes on Spencer Island. This has provided an additional 400 acres of habitat that can be inundated during normal high tide and river flooding events. 6. Improved habitat complexity and connectivity for salmon by breaching the levee at the natural connection point for two main tidal channels. 7. Improved habitat conditions for waterfowl and other fish and wildlife species. 8. Maintained public access to the site for recreational opportunities, including hunting, bird watching, hiking, and wildlife photography, and nature study. Portions of the existing levee were modified as access trails onto the island. All required permits were obtained by fall of 2007 and on the ground restoration was completed during the fall/winter of 2007-2008. Project finalization was completed by June, 2008
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/14/2004Ducks Unlimited - Vancouver (DEPRECATED)Match$110,000.00
Requested07/14/2004Recreation and Conservation Office (RCO)Salmon State Projects$297,686.00
Allocated03/27/2009Ducks Unlimited - Vancouver (DEPRECATED)Match$127,572.32
Allocated03/27/2009Recreation and Conservation Office (RCO)Salmon State Projects$286,986.34
Spent03/27/2009Ducks Unlimited - Vancouver (DEPRECATED)Match-$127,572.32
Spent03/27/2009Recreation and Conservation Office (RCO)Salmon State Projects-$286,986.34
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$487,606.00 $407,686.00 $414,558.66 $414,558.66 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Skykomish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Everett
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Snohomish
HUC12:Snohomish River-Frontal Possession Sound (171100110203)
HUC8:Snohomish (17110011)
Lead Entity Area:Snohomish Basin
Legislative District:38
Legislative District:39
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Pink2-Pop (ESU):Pink-Even Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:09
Sections:10
Sections:15
Sections:16
Sections:21
Sections:22
Snohomish Strategy Group:Estuary restoration
Snohomish Strategy Group:Urban stream restoration
Snohomish Subbasins:Everett Drainages
Snohomish Subbasins:Snohomish Estuary
Snohomish Subbasins:Sunnyside
Steelhead-Pop (ESU):Steelhead-Puget Sound, Snohomish/Skykomish Rivers, Threatened
Township:T29NR05E
Watershed Administrative Unit:Everett
WRIA:Snohomish
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
400.00acres400.00acres
 Channel modification (C.9.c.1)    
Acres of Estuary Treated (C.9.c.3)
400.00acres
Yards (linear measure) of Channel Modified/Created (C.9.c.2)
880.00yd
 Creation of new estuarine area (C.9.q.1)    
Acres of Estuary Created (C.9.q.2)
400.00acres400.00acres
 Dike Or berm modification / removal (C.9.d.1)    
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
400.00acres
Miles Of Dikes Modified/Removed (C.9.d.2)
1.00mi
 Estuarine plant removal / control (C.9.j.1)    
Acres of Estuary Treated for plant removal/control (C.9.j.3)
400.00acres400.00acres