Bear Creek Reach 6 - Phase II Construction
#BCLC-R6-3-BB.16-1215 #BCLC-R6-3-BB.16-1215
 Tier 1 Bear Creek/Cottage Lake Creek Bear Creek Reach 6 - Phase II Construction
Organization Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
Sponsor Adopt A Stream Foundation (AASF)
Status Completed
Schedule Start Date: 1/20/2018 End Date: 10/27/2021
Category Category: Restoration
DESCRIPTION
Adopt A Stream Foundation (AASF) used funds to complete final designs and construct Phase II of a stream restoration along Bear Creek at the Friendly Village Mobile Home Park in Redmond, Washington. This instream restoration project improved adult spawning and juvenile rearing habitat for Chinook, coho, and sockeye salmon by reducing the slope of over-steepened streambanks, adding off-channel habitat along the edges of the creek, removing a foot bridge that confined the channel, installing significant quantities of large wood, and restoring native riparian vegetation in areas that were previously manicured lawn. In 2014, AASF completed the first instream restoration project at this property (project #12-1282). Preliminary Designs for this second phase of restoration were developed with Salmon Recovery Funding Board funding (project #15-1059). Bear Creek is high priority for restoration in the WRIA 8 Chinook Conservation Plan. This project improved habitat conditions for juvenile and adult salmonids by addressing key limiting factors identified in the WIRA 8 Plan: reducing fine sediment inputs, increasing instream complexity, improving riparian conditions and improving floodplain connection. King County Housing authority (KCHA) installed an above ground irrigation system to water the native plants that were installed as part of this project. The irrigation system that was paid for by KCHA will help to establish a healthy riparian buffer and ensure the long-term success of this project.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested03/18/2016Adopt A Stream Foundation (AASF)Match$30,000.00
Requested03/18/2016Recreation and Conservation Office (RCO)Salmon State Projects$170,000.00
Allocated02/27/2020Adopt A Stream Foundation (AASF)Match$56,000.00
Allocated02/27/2020Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$317,299.00
Spent10/27/2021Adopt A Stream Foundation (AASF)Match-$56,000.00
Spent10/27/2021Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$317,299.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$373,299.00 $200,000.00 $373,299.00 $373,299.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Sammamish River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Redmond
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:King
HUC12:Bear Creek (171100120301)
HUC8:Lake Washington (17110012)
Lead Entity Area:Lake Washington/Cedar/Sammamish Watershed (WRIA 8)
Legislative District:48
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:06
Steelhead-Pop (ESU):Steelhead-Puget Sound, North Lake Washington and Lake Sammamish, Threatened
Township:T25NR06E
Watershed Administrative Unit:Sammamish River
WRIA:Cedar - Sammamish
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.06mi0.07mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.06mi0.07mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.30acres0.10acres
Instream Pools Created/Added (C.4.c.6)
4.000.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi0.07mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.01mi0.07mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.06mi0.07mi
Number of structures placed in channel (C.4.d.7)
8.009.00
Pools Created through channel structure placement (C.4.d.5)
5.009.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
1.00acres1.10acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.12mi0.14mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
1.00acres1.10acres
Miles of streambank planted (C.5.c.4)
0.12mi0.14mi
 Unspecified or other riparian habitat project (C.5.k.1)    
Acres of Streambank treated (C.5.k.3)
1.00acres
Miles treated for an unspecified or Other Riparian Habitat Project (C.5.k.2)
0.13mi