Cedar Rapids Floodplain Restoration
#C222 #C222
 Tier 1 Cedar River Cedar Rapids Floodplain Restoration
Organization Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Lead Entity
Sponsor King County Water & Land Resources
Status Completed
Schedule Start Date: 1/1/2005 End Date: 7/7/2009
Category Category: Restoration
DESCRIPTION
King County used this funding for the Cedar Rapids Restoration project, which restored 1,850 feet of riparian and floodplain habitat along a WRIA 8 high-ranked reach of the Cedar River. Historic levees along this reach constricted, reduced, and degraded instream and riparian habitat for Chinook salmon. The project reach contained very few pools and lacked large woody material; off-channel habitat was inaccessible or lacking. The riverbed was incised and spawning gravel was limited by high velocity flows. The project restored a more natural channel form and improved aquatic, riparian, and off-channel floodplain habitats in this important Chinook spawning and rearing area. The project removed levees and bank armoring, reconnected high flows to the adjacent floodplain, restored instream channel, gravel bar, and pool habitats, and recreated riparian floodplain and side-channel habitats. Removal of bank armoring and added large wood increased spawning habitat along the main channel margins and reconnected rearing habitat along the mainstem and side channel areas. Riparian habitat was improved by removing invasive species from the channel banks and from seven acres of floodplain, and by replanting with native tree and shrub species. Flood protection facilities were set back from the channel to protect adjacent homes and infrastructure.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/08/2004King County Water & Land ResourcesMatch$150,000.00
Requested07/08/2004Recreation and Conservation Office (RCO)Salmon State Projects$708,907.00
Allocated12/03/2004King County Water & Land ResourcesMatch$150,000.00
Allocated12/03/2004Recreation and Conservation Office (RCO)Salmon Federal Projects$708,907.00
Spent07/07/2009King County Water & Land ResourcesMatch-$150,000.00
Spent07/07/2009Recreation and Conservation Office (RCO)Salmon Federal Projects-$708,907.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,396,000.00 $858,907.00 $858,907.00 $858,907.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Cedar River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:King
HUC12:Madsen Creek-Cedar River (171100120107)
HUC8:Lake Washington (17110012)
Lead Entity Area:Lake Washington/Cedar/Sammamish Watershed (WRIA 8)
Legislative District:05
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:19
Sections:24
Steelhead-Pop (ESU):Steelhead-Puget Sound, Cedar River, Threatened
Township:T23NR05E
Township:T23NR06E
Watershed Administrative Unit:Lower Cedar River
WRIA:Cedar - Sammamish
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.12mi0.35mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.20mi0.35mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
31.00acres
Instream Pools Created/Added (C.4.c.6)
1.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.35mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.35mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
1.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.35mi
Number of structures placed in channel (C.4.d.7)
180.00
Pools Created through channel structure placement (C.4.d.5)
0.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
3.00yd
 Plant removal/control (C.4.g.1)    
Acres of Streambed Treated for plant removal/control (C.4.g.4)
0.00acres
Miles of Stream Treated for plant removal/control (C.4.g.3)
0.35mi
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.80mi0.80mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
30.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.35mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
30.00acres