White River LB RM 2.5-4.2
#20-1102 #20-1102
Organization Puyallup and Chambers Watershed Salmon Recovery Lead Entity
Sponsor City of Sumner
Status Active
Schedule Start Date: 7/1/2021 End Date: 6/30/2025
Category Category: Restoration
DESCRIPTION
The White River Restoration will restore sustainable instream, floodplain, and wetland habitats within 169 acres of floodplain, riparian, and wetland habitat in the Lower White River, including 3.5 miles of in-stream habitat. Restoring a functional floodplain corridor includes lowering the floodplain to substantially increase the frequency and duration of overbank flows inundation and allow for the creation of new channels. The project includes an anastomosed reach with multiple channels transitioning to a single thread reach that promotes backwater into broad wetland areas with perennial tributary channels. Floodplain connectivity will expand the river's potential to dynamically form and sustain new aquatic habitat throughout the reach. Wetland areas will be installed at elevations to allow development of forested areas that will provide: shade to cool water temperatures, filtration to increase water quality, detrital matter to support prey resources and trees for future wood recruitment. Engineered log jams and complex woody revetments will support formation of in-stream habitat and production of prey resources and provide bank stability during large flood events. In-stream structures will support diverse and complex in-stream habitat overtime to support spawning, migration and rearing. Sumner Link Trail will be rerouted onto the forested berm so it is mostly outside of the floodplain.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/02/2020Recreation and Conservation Office (RCO)PSAR Large Capital Projects$14,641,123.00
Requested04/02/2020City of SumnerMatch$27,400,000.00
Allocated02/24/2025City of SumnerMatch$2,583,728.00
Allocated02/24/2025Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$2,636,035.00
Allocated02/24/2025Recreation and Conservation Office (RCO)PSAR Large Capital Projects$14,641,123.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$49,000,000.00 $42,041,123.00 $19,860,886.00 $0.00 $19,860,886.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, White River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Sumner
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Pierce
HUC12:White River (171100140404)
HUC8:Puyallup (17110014)
Lead Entity Area:Pierce County
Legislative District:31
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:01
Sections:07
Sections:12
Sections:13
Sections:18
Sections:41
Sections:50
Steelhead-Pop (ESU):Steelhead-Puget Sound, White River, Threatened
Township:T20NR04E
Township:T20NR05E
Watershed Administrative Unit:Lower White
WRIA:Puyallup - White
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
2.10mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.40mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
168.60acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.50mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.90mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
3.50mi
Number of structures placed in channel (C.4.d.7)
177.00
Pools Created through channel structure placement (C.4.d.5)
0.00
 Spawning gravel placement (C.4.f.1)    
Cubic Yards of spawning gravel placed (C.4.f.3)
16,000.00cubic yds
Miles of Stream Treated with spawning gravel placement (C.4.f.2)
1.40mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
153.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
3.50mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
153.00acres
Miles of streambank planted (C.5.c.4)
3.50mi