Status Completed
Schedule Start Date: 3/2/2007 End Date: 3/1/2011
Category Category: Restoration
Project Photo
DESCRIPTION
This project installed 5 engineered log jams on US Forest Service property near River mile 7. The project also removed >0.5mile section of an andandoned portion of Forest Road 70 from the floodplain. These five ELJs are large, incorporating 43 key pieces logs, 150 racking logs and 200cy of slash material. Each jams had immediatly provided complex pool habitat with overhead cover for salmonids in the watershed. These large mid channel jams were placed in stragetic locations to restore lateral migration of the river into historic floodplain channels. Shorly after project construction was finished the project reach experienced a bankfull event which activated one of two major floodplain channels. In January 2011, the project reach experienced a 25-50 year event instigating both vertical deposition of channel elevations and lateral movement of the river, reconnecting the current, incised mainstem channel to its historic floodplain. The project is functioning as designed to support floodplain processes and instream habitat for salmonids.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/26/2006South Puget Sound Salmon Enhancement Group (SPSSEG)Match$85,600.00
Requested09/26/2006Recreation and Conservation Office (RCO)Salmon State Projects$485,000.00
Allocated12/06/2006South Puget Sound Salmon Enhancement Group (SPSSEG)Match$85,600.00
Allocated12/06/2006Recreation and Conservation Office (RCO)Salmon Federal Projects$485,000.00
Spent02/17/2011South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$85,600.00
Spent02/17/2011Recreation and Conservation Office (RCO)Salmon Federal Projects-$485,000.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$857,600.00 $570,600.00 $570,600.00 $570,600.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Requested03/20/2018Department of Transportation (WSDOT)Match$287,000.00
Allocated03/20/2018Department of Transportation (WSDOT)Match$287,000.00
Spent03/20/2018Department of Transportation (WSDOT)Match-$287,000.00
Other Funding Totals Proposed Requested Allocated Spent Balance
$0.00 $287,000.00 $287,000.00 $287,000.00 $0.00
Grand Totals Proposed Requested Allocated Spent Balance
$857,600.00 $857,600.00 $857,600.00 $857,600.00 $0.00
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, White River, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:King
County:Pierce
HUC12:Lower Greenwater River (171100140306)
HUC8:Puyallup (17110014)
Lead Entity Area:Pierce County
Legislative District:05
Legislative District:31
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:20
Sections:21
Sections:22
Steelhead-Pop (ESU):Steelhead-Puget Sound, White River, Threatened
Township:T19NR10E
Watershed Administrative Unit:Greenwater
WRIA:Puyallup - White
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
3.00mi1.50mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.60mi1.50mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
65.00acres
Instream Pools Created/Added (C.4.c.6)
5.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.01mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
1.50mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.20acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.60mi
Number of structures placed in channel (C.4.d.7)
5.00
Pools Created through channel structure placement (C.4.d.5)
5.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
9.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.25mi
ADDITIONAL INFORMATION