Agate Passage Preserve
#13-1140 #13-1140
Organization West Sound Partners for Ecosystem Recovery
Sponsor Bainbridge Island Land Trust
Status Completed
Schedule Start Date: 8/22/2013 End Date: 11/15/2017
Category Category: Acquisition & Restoration
Project Photo
DESCRIPTION
Bainbridge Island Land Trust used this funding to acquire two contiguous undeveloped shoreline parcels to permanently protect intact nearshore habitat on Bainbridge Island, improve habitat conditions, while providing pedestrian access to the water. The 12.49 acre property includes 5.06 acres of tidelands with eelgrass beds and sandy beach, 550 feet of shoreline with active feeder bluffs, and 7.43 acres of uplands with riparian vegetation, mixed mature forest, and open meadow. Salmon utilize Bainbridge Island nearshore for many of their life stages and three species of forage fish, important food sources for salmon, utilize the preserves intertidal and waters of Agate Passage, Puget Sound. Identified as highly functioning habitat through the Bainbridge Island Nearshore Assessment and prioritized as a "highest conservation priority" for properties supplying sediment sources on Bainbridge Island, it is north and almost contiguous with over 18 acres of permanently protected tidelands owned by Department of Natural Resources. Properties to the south host good quality nearshore. With this purchase the permanent preservation of over 38 acres and 3,000 linear feet of near-contiguous nearshore processes and functions has been achieved. In addition to the acquisition of the property, a restoration plan was developed and implemented. Cultural resources consultation with RCO, DAHP, and the Suquamish Tribe took place to ensure restoration actions took into consideration historic and cultural resources. Throughout restoration implementation the Land Trust consulted with the tribal archeologist at Suquamish Tribe. Additional site evaluation work was performed by vegetation contractors, wetland delineators, coastal engineers, and other consultants to guide the final restoration plan. Getting input from stakeholders, including neighbors was an important element of the project as we balanced the property as a preserve with public access. A wetland delineation was completed. Continued partnership with entities such as USGS who performs annual eel grass studies, WDFW who conducts sea bird inventories, and other volunteers (Bainbridge Island BioBlitz 2015) took place to inform ongoing stewardship actions. Extensive work to obtain all permits needed for the restoration and site improvement work under this project, in addition to any additional site consultation required as part of permitting. Improvements to the property, utilizing both professional and volunteer labor, included implementing a long term restoration plan to treat invasive plants and install native plants to improve riparian habitat complexity and manage storm water runoff, removing debris and hazards, and securing the property through installation of fencing, gates and signage, and repairing existing stairs to the shoreline. With a goal of helping the property function as natural habitat, we evaluated the removal/changes of existing drainage with an engineer and our stakeholder group, but determined the costs and risks associated with that action outweighed habitat benefits. Preparing the property for public use included siting trails away from bluffs and sensitive areas and preparing safe passage to the shoreline (stair repair/replacement). Interpretative signage explains the importance of the nearshore habitat. Two constructed kiosks host signage about the property rules. The property Stewardship and Management Plan, developed as part of this project, outlines actions to ensure restoration activities continue to achieve desired results to manage the property as a preserve. The property was purchased with private donations, which helped secure the land in 2012 prior to obtaining the grant funding from the Washington Recreation and Conservation Office and Salmon Recovery Funding Board, Puget Sound Partnership’s (PSP) Puget Sound Acquisition and Restoration Fund and the Estuary and Salmon Restoration Program in 2013. Bainbridge Island Land Trust will own and manage the property. An established stewardship and management fund will help support continued activities on the property.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested06/05/2013Bainbridge Island Land TrustMatch$396,000.00
Requested06/05/2013Recreation and Conservation Office (RCO)PSAR Large Capital Projects$810,000.00
Allocated11/15/2017Recreation and Conservation Office (RCO)Estuary & Salmon Restoration$396,000.00
Allocated11/15/2017Recreation and Conservation Office (RCO)PSAR Large Capital Projects$755,902.25
Spent03/27/2014Recreation and Conservation Office (RCO)Estuary & Salmon Restoration-$396,000.00
Spent11/15/2017Bainbridge Island Land TrustMatch-$0.00
Spent11/15/2017Recreation and Conservation Office (RCO)PSAR Large Capital Projects-$755,902.25
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,206,000.00 $1,206,000.00 $1,151,902.25 $1,151,902.25 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Bainbridge Island
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Kitsap
HUC12:Bainbridge Island (171100190404)
HUC8:Puget Sound (17110019)
Lead Entity Area:West Sound Watersheds
Legislative District:23
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:North Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:33
Steelhead-Pop (ESU):Steelhead-Puget Sound, East Kitsap Peninsula Tributaries, Threatened
Township:T26NR02E
Watershed Administrative Unit:Bainbridge Island
WRIA:Kitsap
View project on a larger map

Related Projects

  APPLICATION FINAL 
ACQUISTION METRICS
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition
0.00mi0.00mi
 Land    
Acres by Acreage Type (fee simple)
Riparian
7.43
Tidelands
5.06
Total
12.49
acres
Riparian
7.43
Tidelands
5.06
Total
12.49
acres
 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.10mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
7.00acres7.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.00mi0.10mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
2.00acres1.80acres
Miles of streambank planted (C.5.c.4)
0.00mi0.00mi
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
7.00acres7.00acres
Miles of streambank treated for plant removal/control (C.5.h.4)
0.10mi0.10mi