DESCRIPTION
Replaced a .61m cst culvert that had a hydraulic drop at the inlet and was identified as a fish passage barrier on Barker Creek, with a 34' x 14' bridge. Enhanced 150 ft. of stream with woody material and spawning gravel. The project is located on the Washburn’s' private property in the Barker Creek Watershed. The Salmonid Limiting Factors analysis reports that Barker Creek provides spawning and rearing habitat to Chinook, chum and Coho salmon; steelhead; and cutthroat trout. Chum are especially abundant in the mainstem where fish passage allows. This barrier removal in conjuntion with several fish passage projects downstream have improved fish access to the upper reaches of the creek. The undersized roadway culvert was replaced with a bridge to improve fish passage and restore stream functioning within the road prism. The bridge and stream restoration was approved by Washington State Department of Fish and Wildlife criteria for fish passage. The roadway was restored and drainage improved to reduce turbid discharge to the creek. Woody material and spawning gravel has increased channel complexity, pool-to-riffle ratio, and sinuosity. The Kitsap Conservation District funded the design for the bridge and stream enhancement. Community Salmon Fund funded the stream enhancement portion of the project and FFFPP fundded the bridge and project implementation.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested03/16/2009Recreation and Conservation Office (RCO)FFFPP Grants$111,224.00
Allocated03/21/2011Recreation and Conservation Office (RCO)FFFPP Grants$104,210.87
Spent03/11/2011Kitsap Conservation DistrictMatch-$0.00
Spent03/11/2011Recreation and Conservation Office (RCO)FFFPP Grants-$104,210.87
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$111,224.00 $111,224.00 $104,210.87 $104,210.87 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Silverdale
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Kitsap
HUC12:Barker Creek-Frontal Dyes Inlet (171100190706)
HUC8:Puget Sound (17110019)
Lead Entity Area:West Sound
Legislative District:23
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:North Central Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:15
Steelhead-Pop (ESU):Steelhead-Puget Sound, East Kitsap Peninsula Tributaries, Threatened
Township:T25NR01E
Watershed Administrative Unit:Dyes Inlet
WRIA:Kitsap
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.01mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.54mi0.54mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
1.00sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
0.54mi
Number of bridges (C.2.g.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.01mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.10acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.01mi
Number of structures placed in channel (C.4.d.7)
10.00
Pools Created through channel structure placement (C.4.d.5)
10.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
2.00yd
ADDITIONAL INFORMATION