Crescent Bay Salt Marsh/Salmon Hab. Rest
#06-AMN-06-004 #06-AMN-06-004
 Assessments - Marine / Nearshore Feasibility Assessments Crescent Bay Salt Marsh/Salmon Hab. Rest
Organization Island County Lead Entity
Sponsor Island County
Status Dormant
Schedule Start Date: 2/15/2001 End Date: 5/30/2005
Category Category: Restoration
DESCRIPTION
We propose to remove the tidegate, restore and open channel connection to Crescent Bay and eliminate the Marsh's drainage ditches and dikes. As a result, juvenile salmon habitat and other wetland functions will be restored to Crescent Bay Salt Marsh, Naval Air Station Whidbey Island, significantly increasing the area and quality of estuarine habitat for juvenile salmon rearing along northern Puget Sound shorelines. These actions will promote natural access and use by juvenile salmon and other fishes to the Marsh and linkages to the Crescent Bay ecosystem. The initial 3-year phase of the project will involve pre-construction, baseline ecological assessment, engineering feasibility, hydrological and geomorphological design, construction and post-construction evaluation. A second SRFB proposal will be submitted in Year 3 using initial monitoring results to develop and implement a long-term (e.g. 10 yr) monitoring and adaptive management plan. Island County, will manage the project including; the restoration design in collaboration with hydrologists and geomorphologists from Phillip Williams and Associates; the Corps of Engineers providing technical expertise on the flood study; the Navy and SeaBees removing the tidegate and dikes, excavating the entrance channel and modifying the interior ditches; and, the NASWI managing the Beach Watcher, Oak Harbor Middle School and Boy Scout volunteers for monitoring and revegetation.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested11/15/2000Island CountyMatch$102,200.00
Requested11/15/2000Recreation and Conservation Office (RCO)Salmon State Projects$443,849.00
Allocated05/17/2005Island CountyMatch$102,570.25
Allocated05/17/2005Recreation and Conservation Office (RCO)Salmon Federal Projects$264,673.61
Spent05/17/2005Island CountyMatch-$102,570.25
Spent05/17/2005Recreation and Conservation Office (RCO)Salmon Federal Projects-$264,673.61
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$367,243.86 $546,049.00 $367,243.86 $367,243.86 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Oak Harbor
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Island
HUC12:Skagit Bay (171100191100)
HUC12:Whidbey Island-Frontal Saratoga Passage (171100190103)
HUC8:Puget Sound (17110019)
Lead Entity Area:Island County
Legislative District:10
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Whidbey Island
Salmon Recovery Regions:Puget Sound
Sections:31
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T33NR02E
Watershed Administrative Unit:Whidbey Island
WRIA:Island
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.15mi0.00mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
Square Miles Of streambed made accessible (C.2.b.2)
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.00mi0.00mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
Instream Pools Created/Added (C.4.c.6)
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
 Plant removal/control (C.4.g.1)    
Acres of Streambed Treated for plant removal/control (C.4.g.4)
Miles of Stream Treated for plant removal/control (C.4.g.3)
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.00mi
Wetland Project    
Total Acres Of Wetland Area Treated (C.8.b)
150.00acres0.00acres
 Artificial wetland created (C.8.f.1)    
Artificial Wetland Acres Created (C.8.f.2)
0.00acres0.00acres
 Wetland plant removal / control (C.8.d.1)    
Acres of wetland treated for plant removal/control (C.8.d.3)
0.00acres0.00acres
ADDITIONAL INFORMATION