Point Lawrence Road/Cascade Ck Culvert Replcmnt 2
#09-1731 #09-1731
 Restoration Restoration Projects Point Lawrence Road/Cascade Ck Culvert Replcmnt 2
Organization San Juan County Lead Entity for Salmon Recovery
Sponsor San Juan County Public Works
Status Dormant
Schedule Start Date: 12/10/2009 End Date: 10/31/2011
Category Category: Restoration
Project Photo
DESCRIPTION
San Juan County Public Works proposes to replace one 30 inch diameter culvert and one 18 inch diameter culvert with one new 40 foot bridge at the mouth of Cascade Creek on Orcas Island, where it flows into Buck Bay under Point Lawrence Road in San Juan County. The existing culverts are inadequately sized to convey flood flows down Cascade Creek and to allow full fish passage and tidal exchange. This project will allow full fish passage to pristine shaded riparian habitat at the lower reaches of Cascade Creek including portions which are estuarian. Targeted species include documented coho and documented coastal cutthroat. This fish passage and tidal flow barrier removal project was initiated by Public Works in August of 2003. In 2004, the culverts required emergency repair. The 2004 Hydraulic Project Approval required culvert replacement by July 2011 with a structure designed for fish passage. In 2004, the project was placed on the 6-year Transportation Improvement Program, funds allocated, and scheduled to meet the 2011 deadline. A box culvert replacement was initially proposed as a stand alone project. Further evaluation through a Nearshore Estuary Restoration Feasability study is now included and has been completed. This will ensure the replacement passage structure is sufficient for both creek and tidal flow. A separate project involving acquisition of creekside and nearshore property by the SJPT upstream and adjacent to proposed bridge location is proposed for this year's SRFB funding cycle.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested11/13/2009San Juan County Public WorksMatch$173,000.00
Requested11/13/2009Recreation and Conservation Office (RCO)Salmon State Projects$247,000.00
Allocated12/10/2009San Juan County Public WorksMatch$173,000.00
Allocated12/10/2009Recreation and Conservation Office (RCO)Salmon Federal Projects$247,000.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$900,000.00 $420,000.00 $420,000.00 $0.00 $420,000.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:San Juan
HUC12:Orcas Island (171100030400)
HUC8:San Juan Islands (17110003)
Lead Entity Area:San Juan County
Legislative District:40
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:San Juan Islands
Salmon Recovery Regions:Puget Sound
Sections:09
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T36NR01W
Watershed Administrative Unit:Orcas Island
WRIA:San Juan
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.12mi0.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
Square Miles Of streambed made accessible (C.2.b.2)
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
Number of bridges (C.2.g.2)
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.12mi
Number of culverts (C.2.f.2)
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi
Number of road-crossings (C.2.i.2)
ADDITIONAL INFORMATION