Point Lawrence Road/Cascade Ck Culvert Replacement
#07-1539 #07-1539
 Restoration Restoration Projects Point Lawrence Road/Cascade Ck Culvert Replacement
Organization San Juan County Lead Entity for Salmon Recovery
Sponsor San Juan County Public Works
Status Completed
Schedule Start Date: 3/7/2008 End Date: 1/3/2012
Category Category: Restoration
Project Photo
DESCRIPTION
San Juan County Public Works replaced one 30 inch diameter culvert and one 18 inch diameter culvert with a bridge 41 feet span and 28 feet wide at the mouth of Cascade Creek on Orcas Island, where it flows into Buck Bay under Point Lawrence Road in San Juan County. The project constructed a 19-foot wide channel for Cascade Creek in the upper intertidal zone under the new bridge. The existing culverts were inadequately sized to convey flood flows down Cascade Creek and to allow full fish passage and tidal exchange. This project allows full fish passage to pristine shaded riparian habitat at the lower reaches of Cascade Creek including portions which are estuarian. Targeted species include documented coho and documented coastal cutthroat. This fish passage and tidal flow barrier removal project was initiated by Public Works in August of 2003. In 2004, the culverts required emergency repair. The 2004 Hydraulic Project Approval required culvert replacement by July 2011 with a structure designed for fish passage. In 2004, project was placed on the 6-year Transportation Improvement Program, funds allocated, and scheduled to meet the 2011 deadline. The new channel was opened to creek and tidal flow and the new bridge opened to traffic on Sept 30, 2011.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/17/2007San Juan County Public WorksMatch$155,000.00
Requested09/17/2007Recreation and Conservation Office (RCO)Salmon State Projects$225,000.00
Allocated05/30/2010San Juan County Public WorksMatch$328,000.00
Allocated05/30/2010Recreation and Conservation Office (RCO)Salmon Federal Projects$472,000.00
Spent01/03/2012San Juan County Public WorksMatch-$328,000.00
Spent01/03/2012Recreation and Conservation Office (RCO)Salmon Federal Projects-$472,000.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$900,000.00 $380,000.00 $800,000.00 $800,000.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:San Juan
HUC12:Orcas Island (171100030400)
HUC8:San Juan Islands (17110003)
Lead Entity Area:San Juan County
Legislative District:40
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:San Juan Islands
Salmon Recovery Regions:Puget Sound
Sections:09
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T36NR01W
Watershed Administrative Unit:Orcas Island
WRIA:San Juan
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.06mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
1.00acres
 Culvert modification / removal (C.9.f.1)    
Acres Opened To Fish Passage through culvert modification/removal (C.9.f.3)
1.00acres
Miles of stream made accessible by removal or modification of culvert
0.06
Number of Culverts Modified/Removed To Allow Fish Passage (C.9.f.2)
1.00
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.06mi0.06mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
0.10mi
Number of bridges (C.2.g.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00