Pitship Pocket Estuary Restoration
#07-1884 #07-1884
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor North Olympic Salmon Coalition
Status Completed
Schedule Start Date: 12/13/2007 End Date: 8/2/2010
Category Category: Restoration
Project Photo
DESCRIPTION
North Olympic Salmon Coalition used this funding to replace an undersized culvert with a bridge to restore tidal hydrology and unimpeded fish passage into the Pitship Marsh pocket estuary within the migratory corridor of Sequim Bay on the Olympic Peninsula. The Pitship Marsh complex is a small embayment, with a narrow spit forming across the tidal marsh. The marsh receives freshwater inputs via springs located along the western edge. However, tidal exchange was impaired by the crossing of West Sequim Bay Road, where an undersized culvert connected the marsh to Sequim Bay. This had resulted in the conversion of some salt marsh to freshwater marsh and affected fish passage. Habitat changes of the Pitship Marsh complex from 1870 through 2005 were evaluated, and it was found that the tidal lagoon had been reduced by more than half and the tidal marsh area had been reduced by a quarter (S. Todd et al, 2006). This project replaced the 2.5-foot concrete culvert with a 28-foot concrete bridge and free-flowing channel. It is estimated that this will result in a net increase of 4.2 acres of restored tidal function in the saltmarsh for juvenile salmonid rearing. Saltmarsh is a limited habitat type in Sequim Bay. Access to this salt marsh will allow utilization by out migrating ESA-listed summer chum juveniles from Jimmeycomelately Creek and improve forage fish spwaning as nearshore sediment transport is improved. The new bridge allows for channel movement between the nearshore environment and the estuary and provides much greater connectivity and tidal inundation.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/17/2007North Olympic Salmon CoalitionMatch$80,000.00
Requested09/17/2007Recreation and Conservation Office (RCO)Salmon State Projects$380,250.00
Allocated08/02/2010North Olympic Salmon CoalitionMatch$76,346.45
Allocated08/02/2010Recreation and Conservation Office (RCO)Salmon State Projects$380,187.67
Spent07/07/2010North Olympic Salmon CoalitionMatch-$76,346.45
Spent07/07/2010Recreation and Conservation Office (RCO)Salmon State Projects-$380,187.67
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$460,250.00 $460,250.00 $456,534.12 $456,534.12 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Hood Canal, Strait of Juan de Fuca, Threatened
City Areas:Sequim
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Clallam
HUC12:Johnson Creek-Frontal Sequim Bay (171100200203)
HUC8:Dungeness-Elwha (17110020)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Hood Canal
Sections:27
Steelhead-Pop (ESU):Steelhead-Puget Sound, Sequim/Discovery Bays Tributaries, Threatened
Township:T30NR03W
Watershed Administrative Unit:Sequim Bay
WRIA:Quilcene - Snow
View project on a larger map

Related Places

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.25mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
4.20acres4.20acres
 Culvert modification / removal (C.9.f.1)    
Acres Opened To Fish Passage through culvert modification/removal (C.9.f.3)
4.20acres
Miles of stream made accessible by removal or modification of culvert
0.25
Number of Culverts Modified/Removed To Allow Fish Passage (C.9.f.2)
1.00
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.25mi0.25mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
0.25mi
Number of bridges (C.2.g.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Change in water flow (fish passage project)(cu feet)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00