Dungeness River Estuarine Rest.
#06-2133 #06-2133
Organization North Olympic Peninsula Lead Entity for Salmon
Sponsor Jamestown S'Klallam Tribe
Status Completed
Schedule Start Date: 2/1/2007 End Date: 8/1/2011
Category Category: Restoration
Project Photo
DESCRIPTION
The project created about 5 acres of off-channel river habitat on private land within the project area just north of the WDFW acreage and 3 acres of saltmash opened with the partial removal of a tidal dike on the WDFW property. The 5 acre off-channel habitat is tidally influenced and at higher habitat value than the original plan since it is directly connected to the lower river (see photo attachments). The WDFW property was a retired pasture. We also used the funding to revegetate and maintain plants on about nine upland acres of the properties 40 acres. Other portions of the property are currently being controlled for noxious weeds. The erosion risk assessment did not find any risk to removal of tidal dikes. However it did find a high risk of river channel avulsion across this site. The proposed tidal channels on the WDFW property may have increased avulsion risk, but certainly they would have been blamed for avulsion if it occurred. The Tribe decided to not accept that potential liability. A saltwater intrusion study was inconclusive to the risk of higher well salinities as a result of the project. Based on meetings with the landonwers of the 40 acres saltmarsh, we concluded that working on the private tidelands north of the WDFW property was a better use of this funding.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/12/2006Jamestown S'Klallam TribeMatch$83,000.00
Requested09/12/2006Recreation and Conservation Office (RCO)Salmon State Projects$184,000.00
Allocated12/06/2006Jamestown S'Klallam TribeMatch$83,000.00
Allocated12/06/2006Recreation and Conservation Office (RCO)Salmon State Projects$184,000.00
Spent08/01/2011Jamestown S'Klallam TribeMatch-$83,000.00
Spent08/01/2011Recreation and Conservation Office (RCO)Salmon State Projects-$184,000.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$267,000.00 $267,000.00 $267,000.00 $267,000.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Dungeness River, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Strait of Juan de Fuca, Threatened
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Clallam
HUC12:Lower Dungeness River (171100200307)
HUC8:Dungeness-Elwha (17110020)
Lead Entity Area:North Olympic Peninsula
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Strait of Juan de Fuca
Salmon Recovery Regions:Hood Canal
Sections:41
Steelhead-Pop (ESU):Steelhead-Puget Sound, Dungeness River, Threatened
Township:T31NR04W
Watershed Administrative Unit:Dungeness Valley
WRIA:Elwha - Dungeness
View project on a larger map

Related Projects

Related Places

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
0.00acres8.00acres
 Channel modification (C.9.c.1)    
Acres of Estuary Treated (C.9.c.3)
3.40acres
Yards (linear measure) of Channel Modified/Created (C.9.c.2)
500.00yd
 Creation of new estuarine area (C.9.q.1)    
Acres of Estuary Created (C.9.q.2)
12.00acres0.00acres
 Dike Or berm modification / removal (C.9.d.1)    
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
8.00acres
Miles Of Dikes Modified/Removed (C.9.d.2)
0.10mi
 Estuarine plant removal / control (C.9.j.1)    
Acres of Estuary Treated for plant removal/control (C.9.j.3)
0.00acres8.00acres
 Regrading of slope (C.9.i.1)    
Acres of Estuary Treated through slope regrading (C.9.i.2)
0.00acres
 Shoreline armor removal or modification (C.9.k.1)    
Acres of Shoreline Treated for armor modification/removal (C.9.k.3)
0.00acres
Miles of Shoreline Treated for armor modification/removal (C.9.k.2)
0.00mi
Upland Habitat And Sediment Project    
Acres of Upland Habitat Area Treated (C.6.b.1)
0.00acres
Miles of Road Treated (C.6.b.2)
0.00mi
 Road drainage system improvements and reconstruction (C.6.c.1)    
Average width of road treated for drainage improvements and reconstruction (C.6.c.3)
0.00yd
Miles of Road Treated for drainage improvements and reconstruction (C.6.c.2)
0.00mi
ADDITIONAL INFORMATION