Duckabush R Oxbow Final Design and Restoration
#05-01-81799 #05-01-81799
Organization Hood Canal Coordinating Council Lead Entity
Sponsor Hood Canal Salmon Enhancement Group (HCSEG)
Status Active
Schedule Start Date: 9/14/2023 End Date: 6/30/2026
Category Category: Restoration
DESCRIPTION
The reconnection of this side channel restores floodplain connectivity, large wood abundance, and channel complexity. The reconnection of the side channel on both ends (upstream and downstream) will create new, high quality spawning habitat for Hood Canal Summer Chum within the project site, and activating the floodplain at this location will benefit spawning habitat downstream by promoting sediment processes return to a more natural state. Additionally, the reestablishment of the side channel and subsequent improved ability for the river to access its floodplain will decrease flow velocities during high water events. Slower flow velocities will reduce the potential of Summer Chum redds to be lost due to scour, and thus improve incubation survival rates. The proposed project is to develop a final design that will include both the most recent preliminary design on the upstream connections and the existing preliminary design on the lower portion of the oxbow channel. We will also request funding to implement the recommended project actions in the design. Fill will be removed from two areas upstream in the oxbow channel in order to connect the channel and adjacent wetlands to an existing side channel during high flow events. The previous restoration actions proposed in the original phases of the project (16-1472) and are updated with the latest design elements from the current phase of the project (21-1038).
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested02/24/2023Hood Canal Salmon Enhancement Group (HCSEG)Match$30,436.00
Requested02/24/2023Recreation and Conservation Office (RCO)Salmon State Projects$136,772.00
Allocated10/01/2024Recreation and Conservation Office (RCO)Salmon State Projects$1.00
Allocated10/01/2024Hood Canal Salmon Enhancement Group (HCSEG)Match$8,088.00
Allocated10/01/2024Recreation and Conservation Office (RCO)Salmon Federal Projects$136,771.00
Spent11/25/2024Recreation and Conservation Office (RCO)Salmon State Projects-$0.00
Spent12/16/2024Hood Canal Salmon Enhancement Group (HCSEG)Match-$7,683.60
Spent12/16/2024Recreation and Conservation Office (RCO)Salmon Federal Projects-$129,933.40
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$198,000.00 $167,208.00 $144,860.00 $137,617.00 $7,243.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Mid-Hood Canal, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Hood Canal, Threatened
City Areas:Brinnon
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Jefferson
HUC12:Lower Duckabush River (171100180402)
HUC8:Hood Canal (17110018)
Lead Entity Area:Hood Canal
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Hood Canal
Salmon Recovery Regions:Hood Canal
Sections:16
Sections:17
Steelhead-Pop (ESU):Steelhead-Puget Sound, West Hood Canal Tributaries, Threatened
Township:T25NR02W
Watershed Administrative Unit:Duckabush
WRIA:Skokomish - Dosewallips
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.42mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.42mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
33.00acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.03mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.01mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.03mi
Number of structures placed in channel (C.4.d.7)
40.00
Pools Created through channel structure placement (C.4.d.5)
3.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.20acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.42mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
2.00acres
Miles of streambank planted (C.5.c.4)
0.03mi
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
3.00acres
Miles of streambank treated for plant removal/control (C.5.h.4)