Quilcene Estuarine Wetlands Rest-Schinke
#03-03-7311; 03-05-7311 #03-03-7311; 03-05-7311
Organization Hood Canal Coordinating Council Lead Entity
Sponsor Hood Canal Salmon Enhancement Group (HCSEG)
Status Completed
Schedule Start Date: 2/1/2007 End Date: 2/24/2009
Category Category: Restoration
Project Photo
DESCRIPTION
Hood Canal Salmon Enhancement Group used this funding to complete a restoration project in the Quilcene Estuary. Quilcene Bay, Washington and its associated coastal wetlands provide significant habitats for a wide diversity of wildlife and fish populations including marine mammals, seabirds, migratory shorebirds, migratory and breeding waterfowl, neotropical birds, raptors, salmon, clams and Dungeness crab. Much of Quilcene Bay's estuarine wetlands have been lost by the impacts of agricultural diking, road building and flood control projects. The Quilcene Estuarine Wetlands Restoration and Protection Project returned 38 acres of coastal wetland habitats to properly functioning conditions for the benefit of numerous healthy and imperiled fish and wildlife species. The project was identified in the Hood Canal/Water Resources Inventory Area (WRIA) 17 Limiting Factors Analysis (Washington State Conservation Commission 2002) as a Tier 1 (most important habitat), Priority 1 (most important project) project for the recovery of several Hood Canal salmonid species listed as "threatened" under the Endangered Species Act. The work accomplished included: 1) permanently removing livestock from the 38 acre restoration site, 2) completely removing 3,000 feet of saltwater levee, 3) reestablishing a properly functioning tidal channel network by removing fill from former tidal channels and installing large woody debris in tidal channel network 4) re-establishing appropriate plant communities upon adjacent emergent wetlands. The restored estuarine wetlands (38 acres) and an adjacent 12 acres of estuarine wetlands (50 acres total) will be conserved in perpetuity using a conservation easement.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/15/2006Recreation and Conservation Office (RCO)Salmon State Projects$200,000.00
Requested09/15/2006Hood Canal Salmon Enhancement Group (HCSEG)Match$526,570.00
Allocated02/24/2009Recreation and Conservation Office (RCO)Salmon State Projects$126,323.22
Allocated02/24/2009Hood Canal Salmon Enhancement Group (HCSEG)Match$516,678.09
Spent02/24/2009Recreation and Conservation Office (RCO)Salmon State Projects-$126,323.22
Spent02/24/2009Hood Canal Salmon Enhancement Group (HCSEG)Match-$516,678.09
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$643,001.00 $726,570.00 $643,001.31 $643,001.31 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Hood Canal, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Quilcene
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Jefferson
HUC12:Hood Canal (171100180800)
HUC12:Spencer Creek-Frontal Dabob Bay (171100180701)
HUC8:Hood Canal (17110018)
Lead Entity Area:Hood Canal
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Hood Canal
Salmon Recovery Regions:Hood Canal
Sections:24
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Steelhead-Pop (ESU):Steelhead-Puget Sound, West Hood Canal Tributaries, Threatened
Township:T27NR02W
Watershed Administrative Unit:Big Quil
WRIA:Quilcene - Snow
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
50.00acres5.00acres
 Channel modification (C.9.c.1)    
Acres of Estuary Treated (C.9.c.3)
5.00acres
Yards (linear measure) of Channel Modified/Created (C.9.c.2)
1,000.00yd
 Creation of new estuarine area (C.9.q.1)    
Acres of Estuary Created (C.9.q.2)
0.00acres0.00acres
 Dike Or berm modification / removal (C.9.d.1)    
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
50.00acres
Miles Of Dikes Modified/Removed (C.9.d.2)
2.00mi
 Estuarine plant removal / control (C.9.j.1)    
Acres of Estuary Treated for plant removal/control (C.9.j.3)
0.00acres0.10acres
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
2.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.50mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
2.00acres
Upland Habitat And Sediment Project    
Acres of Upland Habitat Area Treated (C.6.b.1)
0.00acres
Miles of Road Treated (C.6.b.2)
0.50mi
 Road drainage system improvements and reconstruction (C.6.c.1)    
Average width of road treated for drainage improvements and reconstruction (C.6.c.3)
0.00yd
Miles of Road Treated for drainage improvements and reconstruction (C.6.c.2)
0.00mi
ADDITIONAL INFORMATION