Big Quilcene River ELJ Restoration Phase 2
#03-01-7285 #03-01-7285
Organization Hood Canal Coordinating Council Lead Entity
Sponsor Hood Canal Salmon Enhancement Group (HCSEG)
Status Completed
Schedule Start Date: 3/1/2009 End Date: 12/22/2011
Category Category: Restoration
Project Photo
DESCRIPTION
This phase 2 project is the next phase for construction sequencing identified in the 2002 SRRB funded Quilcene River Reach Ananlysis and Feasibility Study by Herrera Environmental Consultants (2004). Phase 1 is targeted for construction summer 2009.  The main goal of the efforts in the restoration reach is to improve the diversity and value of habitat in the Big Quilcene River by expanding floodplain connectivity, installing habitat structure, and improving sediment conditions.  The Quilcene River contains ESA listed Hood Canal Summer run chum, fall chum, coho, steelhead and coastal cutthroat.  Restoration work is required to reverse the adverse effects of past clearing, logging, diking, dredging, and bank armoring that have occurred in this reach over the last 50 years. These activities have resulted in a straightened river corridor, which has induced channel incision because of higher velocities and gradients. These activities have also resulted in a loss of river connectivity with the floodplain has also resulted in a loss of river connectivity with the floodplain has also resulted in a reduction in habitat complexity because of the elimination of pools and a reduction in access to floodplain vegetation and wood recruitment.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested07/21/2008Hood Canal Salmon Enhancement Group (HCSEG)Match$50,000.00
Requested07/21/2008Recreation and Conservation Office (RCO)Salmon State Projects$275,500.00
Allocated12/05/2013Recreation and Conservation Office (RCO)Salmon State Projects$12,500.00
Allocated12/05/2013Hood Canal Salmon Enhancement Group (HCSEG)Match$87,015.55
Allocated12/05/2013Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$217,403.96
Allocated12/05/2013Recreation and Conservation Office (RCO)Salmon Federal Projects$263,000.00
Spent12/30/2010Recreation and Conservation Office (RCO)Salmon State Projects-$12,500.00
Spent12/30/2010Recreation and Conservation Office (RCO)Salmon Federal Projects-$263,000.00
Spent12/05/2013Hood Canal Salmon Enhancement Group (HCSEG)Match-$87,015.55
Spent12/05/2013Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$217,403.96
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$587,680.00 $325,500.00 $579,919.51 $579,919.51 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Hood Canal, Threatened
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Jefferson
HUC12:Lower Big Quilcene River (171100180603)
HUC8:Hood Canal (17110018)
Lead Entity Area:Hood Canal
Legislative District:24
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Hood Canal
Salmon Recovery Regions:Hood Canal
Sections:22
Sections:23
Steelhead-Pop (ESU):Steelhead-Puget Sound, West Hood Canal Tributaries, Threatened
Township:T27NR02W
Watershed Administrative Unit:Big Quil
WRIA:Quilcene - Snow
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.25mi0.25mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.25mi0.25mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
3.00acres
Instream Pools Created/Added (C.4.c.6)
7.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.10mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.25mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
12.00acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.25mi
Number of structures placed in channel (C.4.d.7)
7.00
Pools Created through channel structure placement (C.4.d.5)
7.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
30.00yd
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.00mi0.20mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
5.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.25mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
2.00acres