Schedule Start Date: 9/18/2014 End Date: 12/12/2017
Category Category: Acquisition & Restoration
DESCRIPTION
Beards Cove Acquisition and Restoration project restored nearshore and estuarine habitat in Lynch Cove, on the Union River Estuary, at the toe of Hood Canal on an estuary site filled c. 1973. This estuary provides habitat vital to ESA-listed Puget Sound Chinook, Hood Canal summer chum and winter steelhead. This acquisition/restoration project covered adjacent Beards Cove Community Organization (BCCO), Washington Department of Fish and Wildlife (WDFW), and Great Peninsula Conservancy (GPC)-owned sites. This project took an area of the estuary that was filled around 1973 for BCCO recreational purposes, and returned it to its original estuarine state. GPC acquired a 1.9-acre portion of the previous 3.9-acre BCCO site, added this to its larger 96-acre Klingel Refuge, and restored a 12-acre area spanning the three ownerships. 2,281 feet of tidal channels, 1,754 feet of shoreline, and 7.2 acres of filled tidal marsh/estuarine habitat was restored to benefit Endangered Species Act (ESA)-listed Hood Canal Summer Chum and Puget Sound Chinook salmon species. The restoration project used design plans developed with 2012 SRFB (#12-1312) funding. The project removed 46,000 cubic yards of fill, a derelict swimming pool, picnic pavilion, bathhouse and play equipment, a septic system, sheds, asphalt paving, and invasive plant species; restored grade to historic conditions prior to 1973 fill; restored side-channel habitat; installed LWD; and planted native plant species. 5.4 acres of invasive plants were removed and replaced with 12,000 native plants/shrubs/trees. A temporary irrigation system was installed to aid in plant survivability. 1,754 feet of shoreline and 2,281 feet of tidal channels, and 7.2 acres of near-shore/estuarine habitat was restored. Signs were installed to tell the story of the history of the site and its restoration, and acknowledge three decades of conservation and restoration work by state agencies, local land trusts, the Pacific Northwest Salmon Center and the North Mason School District, adding up to over 650 acres of preserved sub-estuarine, nearshore, riparian, and adjacent upland habitat. GPC completed a Stewardship Plan for the 1.9-acre acquisition, adding this property to the annual monitoring protocol for GPC’s 96-acre Klingel Refuge. The Beards Cove Restoration project provided the missing piece that re-established connectivity among the estuarine habitats running along the northern shore of Lynch Cove, creating 1.7 miles of contiguous, preserved estuarine habitat, vital to multiple ESA-listed stocks.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/17/2014Great Peninsula ConservancyMatch$482,000.00
Requested04/17/2014Recreation and Conservation Office (RCO)Salmon State Projects$600,000.00
Allocated12/12/2017Recreation and Conservation Office (RCO)Salmon Federal Projects$220,537.70
Allocated12/12/2017Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$302,868.00
Allocated12/12/2017Recreation and Conservation Office (RCO)ESRP-EPA Marine & Nearshore$409,000.00
Spent10/26/2015Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$302,868.00
Spent03/07/2016Recreation and Conservation Office (RCO)ESRP-EPA Marine & Nearshore-$409,000.00
Spent06/21/2016Recreation and Conservation Office (RCO)Salmon State Projects-$0.00
Spent12/12/2017Great Peninsula ConservancyMatch-$0.00
Spent12/12/2017Recreation and Conservation Office (RCO)Salmon Federal Projects-$220,537.70
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$932,405.70 $1,082,000.00 $932,405.70 $932,405.70 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Hood Canal, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Belfair
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Mason
HUC12:Hood Canal (171100180800)
HUC12:Little Mission Creek-Frontal Hood Canal (171100180103)
HUC8:Hood Canal (17110018)
Lead Entity Area:Hood Canal
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Hood Canal
Salmon Recovery Regions:Hood Canal
Sections:31
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Hood Canal Tributaries, Threatened
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T23NR01W
Watershed Administrative Unit:Lynch Cove
WRIA:Kitsap
View project on a larger map

Related Projects

  APPLICATION FINAL 
ACQUISTION METRICS
Real Property Acquisition    
Miles of Streambank and/or Shoreline Protected by Land or Easement Acquisition
0.07mi0.07mi
 Land    
Acres by Acreage Type (fee simple)
Tidelands
2.00
Total
2.00
acres
Tidelands
1.90
Total
1.90
acres
 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.35mi0.29mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
7.30acres7.20acres
 Channel modification (C.9.c.1)    
Acres of Estuary Treated (C.9.c.3)
7.30acres7.20acres
Yards (linear measure) of Channel Modified/Created (C.9.c.2)
400.00yd760.00yd
 Debris removal (C.9.n.1)    
Acres Treated for debris removal (C.9.n.2)
3.00acres2.50acres
 Removal of existing fill material (C.9.g.1)    
Acres of Estuary Treated through fill material removal (C.9.g.2)
7.30acres7.20acres
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
5.00acres5.40acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.29mi0.29mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
5.00acres5.40acres
Miles of streambank planted (C.5.c.4)
0.29mi0.29mi
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
5.00acres5.40acres
Miles of streambank treated for plant removal/control (C.5.h.4)
0.29mi0.29mi
ADDITIONAL INFORMATION
NOTES
Hood Canal Summer Chum Recovery Plan, Ch11, p230-Remove fill, pool, infrastructure east of Klingel Wetlands and restore lost salt marsh habitat