Union River Estuary Restoration
#11-03-14620 #11-03-14620
 Mason County- Union Union Estuary Restoration Union River Estuary Restoration
Organization Hood Canal Coordinating Council Lead Entity
Sponsor Hood Canal Salmon Enhancement Group (HCSEG)
Status Completed
Schedule Start Date: 12/8/2011 End Date: 6/26/2014
Category Category: Restoration
Project Photo
DESCRIPTION
The Union River Estuary Restoration project was a restoration project based on the design funded by the SRFB in 2010. It is located at the mouth of the Union River in Mason County adjacent to Belfair and represents over 23% of the original Union/Lynch Cove Estuary The purpose of this project was to restore the estuary and tidal function to 31 acres by breaching the existing dike in two locations, regrading to a variety of elevations, accommodating storm water drainage, replicating native estuarine habitat, primarily vegetated estuarine saltmarsh habitat necessary for juvenile endangered Hood Canal summer chum and Puget Sound Chinook as well as coho, cutthroat trout. It was also designed to prevent flooding of surrounding property owners while accommodating continued recreational use of the existing trail system (IAC 1994) with pile supported walkways over the dike breaches. One 300 foot breach and another 100 foot breach was developed in order permit both salt and fresh water inundation and create maximum value for the scale of the project. Land use changes have been documented (LFA, 2003) and the Union River is identified as a tier 1 priority watershed S H R S, 2004) for habitat restoration.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/29/2011Recreation and Conservation Office (RCO)Salmon State Projects$300,000.00
Requested08/29/2011Hood Canal Salmon Enhancement Group (HCSEG)Match$1,500,000.00
Allocated06/26/2014Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$299,999.07
Allocated06/26/2014Hood Canal Salmon Enhancement Group (HCSEG)Match$1,499,995.35
Spent06/26/2014Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$299,999.07
Spent06/26/2014Hood Canal Salmon Enhancement Group (HCSEG)Match-$1,499,995.35
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,800,000.00 $1,800,000.00 $1,799,994.42 $1,799,994.42 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Hood Canal, Hood Canal, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Belfair
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Mason
HUC12:Hood Canal (171100180800)
HUC12:Sweetwater Creek-Frontal Hood Canal (171100180102)
HUC8:Hood Canal (17110018)
Lead Entity Area:Hood Canal
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:Hood Canal
Salmon Recovery Regions:Hood Canal
Sections:32
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Hood Canal Tributaries, Threatened
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T23NR01W
Watershed Administrative Unit:Lynch Cove
WRIA:Kitsap
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.05mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
39.00acres31.00acres
 Channel modification (C.9.c.1)    
Acres of Estuary Treated (C.9.c.3)
0.80acres
 Creation of new estuarine area (C.9.q.1)    
Acres of Estuary Created (C.9.q.2)
39.00acres31.00acres
 Dike Or berm modification / removal (C.9.d.1)    
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
39.00acres31.00acres
Miles Of Dikes Modified/Removed (C.9.d.2)
0.20mi0.05mi
 Estuarine planting or native plant establishment (C.9.r.1)    
Acres of Estuarine planting or native plant establishment (C.9.r.3)
4.90acres
 Overwater structure removal / modification (C.9.o.1)    
Acres Treated with overwater structure removal/modification (C.9.o.2)
39.00acres31.00acres
 Regrading of slope (C.9.i.1)    
Acres of Estuary Treated through slope regrading (C.9.i.2)
39.00acres31.00acres
 Removal of existing fill material (C.9.g.1)    
Acres of Estuary Treated through fill material removal (C.9.g.2)
39.00acres31.00acres
 Tidegate alteration / removal (C.9.e.1)    
Acres opened To Fish Passage through tidegate alteration/removal (C.9.e.3)
39.00acres31.00acres
Miles of stream made accessible by removal or modification of tidegate
Number of Tidegates Altered/Removed To Allow Fish Passage (C.9.e.2)
1.002.00
ADDITIONAL INFORMATION