Galivan - Perry Creek Trib
#04-1036 #04-1036
Organization Kennedy-Goldsborough Basin (WRIA 14) Salmon Recovery Lead Entity
Sponsor South Puget Sound Salmon Enhancement Group (SPSSEG)
Status Completed
Schedule Start Date: 6/1/2004 End Date: 3/8/2006
Category Category: Restoration
DESCRIPTION
This salmon enhancement project is located on an unnamed right bank tributary to mainstem Perry Creek in Thurston County (WRIA 14). Mainstem Perry Creek enters Mud Bay and is a productive salmon stream. The mouth of the Perry Creek tributary (14.0002) culvert project is approximately 500m upstream from the estuary and is about 2100m in total length. This project is located on a private road that accesses about 5 acres of forestland on the opposite side of the creek from the landowner's home. The landowner would like to keep access to their property while improving salmon passage and culvert maintenance. This project will remove two inadequate barrier culverts and replace them with a single large squash culvert. The proposed culvert will be 9' wide x 5' tall x 30' long. This culvert will satisfy the "no slope" option outlined by WDFW in their recent 2003 Culvert Manual. The culvert will be large enough to pass high water flows, sediment bed-load material, LWD, and salmon at all life stages. This project is important to create additional spatial distribution for chum, coho, and cutthroat. Perry Creek is a dominant chum stream in the South Sound that produces thousands of chum annually. There is a natural waterfall on mainstem Perry Creek (upstream of the tributary confluence) that prohibits salmon passage. This project will improve existing access on stream 14.0002 that will be used predominantly by rearing species of salmonids.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested06/11/2004Recreation and Conservation Office (RCO)FFFPP Grants$29,900.00
Allocated03/08/2006Recreation and Conservation Office (RCO)FFFPP Grants$19,051.52
Spent03/08/2005South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$0.00
Spent03/08/2005Recreation and Conservation Office (RCO)FFFPP Grants-$19,051.52
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$19,051.52 $29,900.00 $19,051.52 $19,051.52 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Thurston
HUC12:Perry Creek-Frontal Eld Inlet (171100190505)
HUC8:Puget Sound (17110019)
Lead Entity Area:WRIA 14
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:14
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Township:T18NR03W
Watershed Administrative Unit:Kennedy Creek
WRIA:Kennedy - Goldsborough
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.01mi0.01mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
1.00mi2.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
1.00mi1.00mi
Number of culverts (C.2.f.2)
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi1.00mi
Number of road-crossings (C.2.i.2)
Site Stewardship Project    
 Restored land maintained (C.11.c.1)    
Acres of restored land maintained (C.11.c.2)