DESCRIPTION
This salmon enhancement project is located on a small independent tributary to Frye Cove in Thurston County. Frye Cove Creek enters Eld Inlet and is about 2000m long. The proposed culvert project is about 300m upstream of the estuary. This watershed provides habitat for coastal cutthroat, coho, chum, and resident trout. This project will provide improved access to over 1700m of habitat. The wetland headwaters for Frye Cove Creek has recently been protected by a landowner conservation easement prepared by Capital Land Trust. Half of the estuary is protected by Frye Cove Park (Thurston County) and the other half of the estuary is protected by one landowner. The existing 4' culvert was seriously damaged during a significant flooding event in the mid 1990's. The outlet was crushed and became a total barrier for all species of fish. During stream surveys, SPSSEG field crews identified carcasses downstream but did not observe any fish upstream. During landowner interviews, SPSSEG did talk to several landowners who claimed to see salmon several years prior to the culvert being damaged. This project will remove a significant fish barrier low in the watershed. A low maintenance culvert will be installed using a WDFW stream simulation model design. This proposed 12' diameter culvert will be large enough to pass high water flows and anticipated debris. The correction of this culvert will provide natural stream function at this site low in the watershed.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
RequestedRecreation and Conservation Office (RCO)FFFPP Grants$87,863.00
Allocated03/15/2005Recreation and Conservation Office (RCO)FFFPP Grants$99,380.00
Spent04/05/2005South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$0.00
Spent04/05/2005Recreation and Conservation Office (RCO)FFFPP Grants-$99,380.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$99,380.00 $87,863.00 $99,380.00 $99,380.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Thurston
HUC12:Perry Creek-Frontal Eld Inlet (171100190505)
HUC8:Puget Sound (17110019)
Lead Entity Area:WRIA 14
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:19
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Township:T19NR02W
Watershed Administrative Unit:Young Cove
WRIA:Kennedy - Goldsborough
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.01mi0.01mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
1.25mi1.25mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
1.25mi1.25mi
Number of culverts (C.2.f.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi0.00mi
Number of road-crossings (C.2.i.2)
Site Stewardship Project    
 Restored land maintained (C.11.c.1)    
Acres of restored land maintained (C.11.c.2)
ADDITIONAL INFORMATION