Prairie Creek Barrier Removal Project
#18-1493 #18-1493
 Chehalis Mainstem Management Unit Bunker Creek Prairie Creek Barrier Removal Project
Organization Chehalis Basin Lead Entity
Sponsor Lewis County Public Works
Status Completed
Schedule Start Date: 1/19/2018 End Date: 12/2/2019
Category Category: Restoration
DESCRIPTION
The primary objective of the Prairie Creek Barrier Removal is to replace an existing fish passage barrier with a fish passable structure. The goal of this action is to construct a culvert that will restore salmon access to 4.75 linear miles of potential habitat; approximately 260 square meters (0.06 acres) of spawning habitat and 10,172 square meters (2.51 acres) of rearing habitat for the Southwest Washington evolutionary significant unit (ESU) of coho salmon, and the Southwest Washington distinct population segment (DPS) of winter steelhead trout, as well as searun cutthroat and resident cutthroat trout. The culvert proposed for replacement is ranked 14th on a list of priority culverts for replacement within the Chehalis Basin and 8th on a list pf priority to be replaced that are owned by Lewis County. A stream survey on Prairie Creek was performed by the Lewis County Conservation District in 2001. A priority index (PI) of 16.22 has been assigned to this barrier culvert.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/09/2018Recreation and Conservation Office (RCO)CBS Habitat Rest. Project$768,194.00
Allocated04/09/2018Recreation and Conservation Office (RCO)CBS Habitat Rest. Project$768,194.00
Spent11/26/2019Lewis County Public WorksMatch-$0.00
Spent11/26/2019Recreation and Conservation Office (RCO)CBS Habitat Rest. Project-$768,194.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$768,194.00 $768,194.00 $768,194.00 $768,194.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
SECONDARY SPONSOR CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chehalis GSU:Bunker Cr
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Southwest Washington, Not Determined
County:Lewis
HUC12:Bunker Creek (171001030109)
HUC8:Upper Chehalis (17100103)
Lead Entity Area:Chehalis Basin
Legislative District:19
Salmon Recovery Regions:Washington Coast
Sections:26
Steelhead-Pop (ESU):Steelhead-Washington Coast, Not Warranted
Township:T14NR04W
Watershed Administrative Unit:Bunker Creek
WRIA:Upper Chehalis
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.03mi0.04mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
4.75mi4.75mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.001.00
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
4.75mi4.75mi
Number of culverts (C.2.f.2)
1.001.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.00mi0.00mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.00mi0.00mi
Number of structures placed in channel (C.4.d.7)
7.007.00
Pools Created through channel structure placement (C.4.d.5)
0.000.00
ADDITIONAL INFORMATION